Current status: Operational
99.42% uptime for 90 days
Filters
Date range
From
E.g., 2020-09-24
To
E.g., 2020-09-24

Alerts

Start TimeServiceTypeDescription
Sep 17, 2020 7:00 amWiredNetworkArts Azure WVD VPN Tunnel Maintenance and Testing
Sep 16, 2020 7:00 amWiredNetworkIST data centre fiber maintenance
Sep 11, 2020 9:00 amWiredNetworkOutage on BMH first floor
Sep 04, 2020 6:00 amWired, WirelessNetworkSwitch Refresh
Aug 28, 2020 6:30 amWired, WirelessNetworkEC1 Router Replacement
Aug 25, 2020 7:00 amWiredNetworkDWE second floor network switch replacement
Aug 12, 2020 7:00 amWiredNetworkAzure-VPN - IST Data Center Firewall Configuration Changes
Aug 07, 2020 6:45 amWiredNetworkAzure-VPN - IST Data Center Firewall Configuration Changes
Aug 07, 2020 6:30 amWired, WirelessNetworkEC5 Router Replacement
Aug 06, 2020 6:00 amWiredNetworkCampus firewall software update
Aug 05, 2020 11:20 amWiredNetworkEC3 first floor network outage
Aug 05, 2020 7:00 amWiredNetworkNetwork maintenance: BMH, DP, STJ-RC
Aug 04, 2020 7:00 amWiredNetworkNetwork maintenance: RA2, TC, TJB
Aug 04, 2020 7:00 amWiredNetworkEC4 network switch reload
Jul 30, 2020 7:00 amWiredNetworkNetwork maintenance: HS, RAC, SCH
Jul 29, 2020 7:00 amWiredNetworkPAS RCH SLC Network Maintenance
Jul 28, 2020 7:00 amWiredNetworkEIT DWE OPT Network Maintenance
Jul 28, 2020 7:00 amWiredNetworkPhy-1002 Switch Replacement
Jul 27, 2020 9:00 amWiredNetworkEC4 network degraded
Jul 24, 2020 6:30 amWired, WirelessNetworkEC4 Router Replacement
Jul 22, 2020 7:00 amWiredNetworkEIT third floor network maintenance
Jul 21, 2020 11:00 amWiredNetworkec4 router offline
Jul 21, 2020 3:00 amWired, WirelessNetworkEV1 aggregation switch offline (HH, REN, ECH, STP)
Jul 10, 2020 7:00 amWiredNetworkBMH Addition network switch maintenance
Jul 08, 2020 6:00 amWired, WirelessNetworkE5 6117 switch upgrade