Monday, April 2, 2018

Due to renovations and expansions being made to the Student Life Center's dining room, students are to note that they will no long have access to the main level of SLC.

Access to the building will only be possible from Ring Road entrance, the Turnkey entrance and the SLC/PAC link. The lower and upper levels of SLC will still be accessible through the main stairwell to the lower level and the fire exit stairwells. 

These changes will also result in cafeteria seating, Brubakers, Subway, Campus Bubble and Wasabi closures from now through the spring term.