Publications
Multi-criteria decision analysis for infrastructure privatisation using conflict resolution. Structure and Infrastructure Engineering, 7, 661-671. doi:10.1080/15732470802677649
. (2011). Multiple optimization and segmentation technique (MOST) for large-scale bilevel life cycle optimization. Canadian Journal of Civil Engineering, 38, 263-271. doi:10.1139/L10-134
. (2011). Prospects of mind maps for better visualization of infrastructure literature. Journal of Professional Issues in Engineering Education and Practice, 137, 239-247. doi:10.1061/(ASCE)EI.1943-5541.0000072
. (2011). Attitude-based negotiation methodology for the management of construction disputes. Journal of Management in Engineering, 26, 114-122. doi:10.1061/(ASCE)ME.1943-5479.0000013
. (2010). Computerized DSS for construction conflict resolution under uncertainty. Journal of Construction Engineering and Management, 136, 1249-1257. doi:10.1061/(ASCE)CO.1943-7862.0000239
. (2010). Critical path segments scheduling technique. Journal of Construction Engineering and Management, 136, 1078-1085. doi:10.1061/(ASCE)CO.1943-7862.0000212
. (2010). Discussion of "permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling" by Jin-Lee Kim and Ralph D. Ellis Jr. Journal of Construction Engineering and Management, 136, 717-718. doi:10.1061/(ASCE)CO.1943-7862.0000075
. (2010). Roof deterioration and impact: A questionnaire survey. Journal of Retail and Leisure Property, 9, 337-348. doi:10.1057/rlp.2010.18
. (2010). Two condition indicators for building components based on reactive-maintenance data. Journal of Facilities Management, 8, 64-74. doi:10.1108/14725961011019085
. (2010). Integrated multiple-element bridge management system. Journal of Bridge Engineering, 14, 179-187. doi:10.1061/(ASCE)1084-0702(2009)14:3(179)
. (2009). Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134, 253-264. doi:10.1061/(ASCE)0733-9364(2008)134:4(253)
. (2008). System of multiple ANNs for online planning of numerous building improvements. Journal of Construction Engineering and Management, 134, 342-351. doi:10.1061/(ASCE)0733-9364(2008)134:5(342)
. (2008). Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134, 575-582. doi:10.1061/(ASCE)0733-9364(2008)134:8(575)
. (2008). Computerized system for efficient delivery of infrastructure maintenance/repair programs. Journal of Construction Engineering and Management, 132, 26-34. doi:10.1061/(ASCE)0733-9364(2006)132:1(26)
. (2006). Better visualization for multiple-site infrastructure programs using GIS. Solid Mechanics and its Applications, 140, 793-800. doi:10.1007/1-4020-4891-2_67
. (2006). Comparison of two evolutionary algorithms for optimization of bridge deck repairs. Computer-Aided Civil and Infrastructure Engineering, 21, 561-572. doi:10.1111/j.1467-8667.2006.00458.x
. (2006). Conflict resolution in construction disputes using the graph model. Journal of Construction Engineering and Management, 132, 1043-1052. doi:10.1061/(ASCE)0733-9364(2006)132:10(1043)
. (2006). Simplified project management for construction practitioners. Cost Engineering (Morgantown, West Virginia), 48, 20-28. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-33751371489&partnerID=40&md5=9925257869b4032983bfc945e5f91c3a
. (2006). Closure to “reconstruction of the building infrastructure: Two performance prediction models”. Journal of Infrastructure Systems, 11, 269-269. doi:10.1061/(ASCE)1076-0342(2005)11:4(269)
. (2005). Comparison among five evolutionary-based optimization algorithms. Advanced Engineering Informatics, 19, 43-53. doi:10.1016/j.aei.2005.01.004
. (2005).