Publications

Search
Author Title Type [ Year(Desc)]
1991
Moselhi, O. , Hegazy, T. , & Fazio, P. . (1991). Practical cost estimation in a competitive environment. In Transactions of the American Association of Cost Engineers (p. H.5.1-H.5.9). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0025846078&partnerID=40&md5=468b6a346233b1cb9623fbb570881cd5
1999
Hegazy, T. , & Elbeltagi, E. . (1999). EvoSite: Evolution-based model for site layout planning. Journal of Computing in Civil Engineering, 13, 198-206. doi:10.1061/(ASCE)0887-3801(1999)13:3(198)
Elbeltagi, E. , & Hegazy, T. M. . (1999). Genetic optimization of site layout planning. In AACE International. Transactions of the Annual Meeting (p. IT.05.1-IT.05.8). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-18144449295&partnerID=40&md5=c7fca9737c98e3c125645ccc8e518b91
Hegazy, T. . (1999). Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management, 125, 167-175. doi:10.1061/(ASCE)0733-9364(1999)125:3(167)
2000
Hegazy, T. , Shabeeb, A. K. , Elbeltagi, E. , & Cheema, T. . (2000). Algorithm for scheduling with multiskilled constrained resources. Journal of Construction Engineering and Management, 126, 414-421. doi:10.1061/(ASCE)0733-9364(2000)126:6(414)
Karray, F. , Zaneldin, E. , Hegazy, T. , Shabeeb, A. , & Elbeltagi, E. . (2000). Computational intelligence tools for solving the facilities layout planning problem. In Proceedings of the American Control Conference (Vol. 6, pp. 3954-3958). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0034539982&partnerID=40&md5=c1cca7eac81041576416198ccca46911
McKim, R. , Hegazy, T. , & Attalla, M. . (2000). Project performance control in reconstruction projects. Journal of Construction Engineering and Management, 126, 137-141. doi:10.1061/(ASCE)0733-9364(2000)126:2(137)
2001
Hegazy, T. , & Wassef, N. . (2001). Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127, 183-191. doi:10.1061/(ASCE)0733-9364(2001)127:3(183)
Elbeltagi, E. , & Hegazy, T. . (2001). A hybrid-based system for site layout planning in construction. Computer-Aided Civil and Infrastructure Engineering, 16, 79-93. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0035052778&partnerID=40&md5=929d005a7096d2f79cf324330769f59c
Zaneldin, E. , Hegazy, T. , & Grierson, D. . (2001). Improving design coordination for building projects. II: A collaborative system. Journal of Construction Engineering and Management, 127, 330-336. doi:10.1061/(ASCE)0733-9364(2001)127:4(330)
Hegazy, T. , Zaneldin, E. , & Grierson, D. . (2001). Improving design coordination for building projects. I: Information model. Journal of Construction Engineering and Management, 127, 322-329. doi:10.1061/(ASCE)0733-9364(2001)127:4(322)
Hegazy, T. , & Ersahin, T. . (2001). Simplified spreadsheet solutions: I: Subcontractor information system. Journal of Construction Engineering and Management, 127, 461-468. doi:10.1061/(ASCE)0733-9364(2001)127:6(461)
Hegazy, T. , & Ersahin, T. . (2001). Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127, 469-475. doi:10.1061/(ASCE)0733-9364(2001)127:6(469)
2003
Morcous, G. , & Hegazy, T. . (2003). Discussion of "Improving design coordination for building projects. I: Information model" by Tarek Hegazy, Essam Zaneldin, and Donald Grierson. Journal of Construction Engineering and Management, 129, 470-471. doi:10.1061/(ASCE)0733-9364(2003)129:4(470)
Hegazy, T. , & Petzold, K. . (2003). Genetic optimization for dynamic project control. Journal of Construction Engineering and Management, 129, 396-404. doi:10.1061/(ASCE)0733-9364(2003)129:4(396)
Attalla, M. , Hegazy, T. , & Haas, R. . (2003). Reconstruction of the building infrastructure: Two performance prediction models. Journal of Infrastructure Systems, 9, 26-34. doi:10.1061/(ASCE)1076-0342(2003)9:1(26)
Hegazy, T. , & Kassab, M. . (2003). Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management, 129, 698-705. doi:10.1061/(ASCE)0733-9364(2003)129:6(698)

Pages