Publications

Search
Author [ Title(Desc)] Type Year
D
Hegazy, T. M. , & Menesi, W. . (2007). Delay analysis under multiple baseline updates. In AACE International Transactions (p. CDR.19.1-CDR.19.8). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-55849142618&partnerID=40&md5=78274ab69eb3af8d106b6925d399fdfe
Menesi, W. , & Hegazy, T. . (2014). Discussion of "ant colony optimization for multimode resource-constrained project scheduling" by Hong Zhang. Journal of Management in Engineering, 30. doi:10.1061/(ASCE)ME.1943-5479.0000190
Morcous, G. , & Hegazy, T. . (2003). Discussion of "Improving design coordination for building projects. I: Information model" by Tarek Hegazy, Essam Zaneldin, and Donald Grierson. Journal of Construction Engineering and Management, 129, 470-471. doi:10.1061/(ASCE)0733-9364(2003)129:4(470)
Hegazy, T. . (2010). Discussion of "permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling" by Jin-Lee Kim and Ralph D. Ellis Jr. Journal of Construction Engineering and Management, 136, 717-718. doi:10.1061/(ASCE)CO.1943-7862.0000075
Minocha, V. K. , & Hegazy, T. . (2005). Discussion of "Reconstruction of the building infrastructure: Two performance prediction models" by Mohamed Attalla, Tarek Hegazy, and Ralph Haas. Journal of Infrastructure Systems, 11, 268-269. doi:10.1061/(ASCE)1076-0342(2005)11:4(268)
Hegazy, T. . (2011). Discussion of "time-profit trade-off analysis for construction projects" by Ahmed Senouci and Khaled El-Rayes. Journal of Construction Engineering and Management, 137, 96-97. doi:10.1061/(ASCE)CO.1943-7862.0000173
Hegazy, T. , Elhakeem, A. , & Elbeltagi, E. . (2004). Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130, 160-167. doi:10.1061/(ASCE)0733-9364(2004)130:2(160)
Elbeltagi, E. , Hegazy, T. , & Eldosouky, A. . (2004). Dynamic layout of construction temporary facilities considering safety. Journal of Construction Engineering and Management, 130, 534-541. doi:10.1061/(ASCE)0733-9364(2004)130:4(534)
Hegazy, T. , & Gad, W. . (2015). Dynamic System for Prioritizing and Accelerating Inspections to Support Capital Renewal of Buildings. Journal of Computing in Civil Engineering, 29. doi:10.1061/(ASCE)CP.1943-5487.0000351
E
Saad, D. A. , & Hegazy, T. . (2017). Economic optimization for the rehabilitation of co-located mixed assets. Canadian Journal of Civil Engineering, 44, 820-828. doi:10.1139/cjce-2016-0509
Hegazy, T. , & Kamarah, E. . (2008). Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134, 253-264. doi:10.1061/(ASCE)0733-9364(2008)134:4(253)
Hegazy, T. , & Moselhi, O. . (1995). Elements of cost estimation: a survey in Canada and the United States. Cost Engineering (Morgantown, West Virginia), 37, 27-33. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0029296896&partnerID=40&md5=edb2cfd356b1d37fab5639376ab51fc7
Hegazy, T. , & Abdel-Monem, M. . (2012). Email-based system for documenting construction as-built details. Automation in Construction, 24, 130-137. doi:10.1016/j.autcon.2012.02.014
Saad, D. A. , & Hegazy, T. . (2015). Enhanced benefit-cost analysis for infrastructure fund allocation. Canadian Journal of Civil Engineering, 42, 89-97. doi:10.1139/cjce-2014-0281
Abdel-Monem, M. , & Hegazy, T. . (2013). Enhancing construction as-built documentation using interactive voice response. Journal of Construction Engineering and Management, 139, 895-898. doi:10.1061/(ASCE)CO.1943-7862.0000648
Hegazy, T. , & Menesi, W. . (2012). Enhancing the critical path segments scheduling technique for project control. Canadian Journal of Civil Engineering, 39, 968-977. doi:10.1139/L2012-024
Elbeltagi, E. , Elbehairy, H. , Hegazy, T. , & Grierson, D. . (2005). Evolutionary algorithms for optimizing bridge deck rehabilitation. In Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering (pp. 619-630). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-27144472763&partnerID=40&md5=4da109681d4762aebab3b3f52f26cd04
Hegazy, T. , & Elbeltagi, E. . (1999). EvoSite: Evolution-based model for site layout planning. Journal of Computing in Civil Engineering, 13, 198-206. doi:10.1061/(ASCE)0887-3801(1999)13:3(198)
Hegazy, T. M. , & Khalifa, J. . (1996). Expert rules-of-thumb for effective design coordination. In AACE International. Transactions of the Annual Meeting. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0029708513&partnerID=40&md5=cc65b0632d54f6a529cc1d6de25701ca
F
Menesi, W. , Golzarpoor, B. , & Hegazy, T. . (2013). Fast and near-optimum schedule optimization for large-scale projects. Journal of Construction Engineering and Management, 139, 1117-1124. doi:10.1061/(ASCE)CO.1943-7862.0000722

Pages