Publications

Search
Author Title [ Type(Desc)] Year
Journal Article
Rashedi, R. , & Hegazy, T. . (2015). Capital renewal optimisation for large-scale infrastructure networks: genetic algorithms versus advanced mathematical tools. Structure and Infrastructure Engineering, 11, 253-262. doi:10.1080/15732479.2013.866968
Hegazy, T. , & Gad, W. . (2015). Dynamic System for Prioritizing and Accelerating Inspections to Support Capital Renewal of Buildings. Journal of Computing in Civil Engineering, 29. doi:10.1061/(ASCE)CP.1943-5487.0000351
Saad, D. A. , & Hegazy, T. . (2015). Enhanced benefit-cost analysis for infrastructure fund allocation. Canadian Journal of Civil Engineering, 42, 89-97. doi:10.1139/cjce-2014-0281
Saad, D. A. , & Hegazy, T. . (2015). Microeconomic optimization and what-if analysis for facilities renewal. Journal of Facilities Management, 13, 350-365. doi:10.1108/JFM-10-2014-0034
Albukhari, I. , & Hegazy, T. . (2015). Multiple-Criteria BIM-based evaluation of architectural submittals. International Journal of Mathematical Models and Methods in Applied Sciences, 9, 453-462. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-84938384749&partnerID=40&md5=a7e5d8e9c68c6556317ba9b466af580e
Menesi, W. , & Hegazy, T. . (2014). Discussion of "ant colony optimization for multimode resource-constrained project scheduling" by Hong Zhang. Journal of Management in Engineering, 30. doi:10.1061/(ASCE)ME.1943-5479.0000190
Hegazy, T. , & Saad, D. A. . (2014). A microeconomic perspective on infrastructure rehabilitation. Construction Management and Economics, 32, 433-445. doi:10.1080/01446193.2013.879193
Ali, A. , & Hegazy, T. . (2014). Multicriteria assessment and prioritization of hospital renewal needs. Journal of Performance of Constructed Facilities, 28, 528-538. doi:10.1061/(ASCE)CF.1943-5509.0000455
Abdel-Monem, M. , & Hegazy, T. . (2013). Enhancing construction as-built documentation using interactive voice response. Journal of Construction Engineering and Management, 139, 895-898. doi:10.1061/(ASCE)CO.1943-7862.0000648
Menesi, W. , Golzarpoor, B. , & Hegazy, T. . (2013). Fast and near-optimum schedule optimization for large-scale projects. Journal of Construction Engineering and Management, 139, 1117-1124. doi:10.1061/(ASCE)CO.1943-7862.0000722
Hegazy, T. , Abdel-Monem, M. , Saad, D. A. , & Rashedi, R. . (2013). Hands-on exercise for enhancing students' construction management skills. Journal of Construction Engineering and Management, 139, 1135-1143. doi:10.1061/(ASCE)CO.1943-7862.0000705
Hegazy, T. , & Rashedi, R. . (2013). Large-scale asset renewal optimization using genetic algorithms plus segmentation. Journal of Computing in Civil Engineering, 27, 419-426. doi:10.1061/(ASCE)CP.1943-5487.0000249
Elhakeem, A. , & Hegazy, T. . (2012). Building asset management with deficiency tracking and integrated life cycle optimisation. Structure and Infrastructure Engineering, 8, 729-738. doi:10.1080/15732471003777071
Hegazy, T. , & Menesi, W. . (2012). Closure to critical path segments scheduling technique by Tarek Hegazy and Wail Menesi. Journal of Construction Engineering and Management, 138, 788-789. doi:10.1061/(ASCE)CO.1943-7862.0000541
Hegazy, T. , & Abdel-Monem, M. . (2012). Email-based system for documenting construction as-built details. Automation in Construction, 24, 130-137. doi:10.1016/j.autcon.2012.02.014
Hegazy, T. , & Menesi, W. . (2012). Enhancing the critical path segments scheduling technique for project control. Canadian Journal of Civil Engineering, 39, 968-977. doi:10.1139/L2012-024
Hegazy, T. , & Menesi, W. . (2012). Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138, 688-696. doi:10.1061/(ASCE)CO.1943-7862.0000483
Hegazy, T. , Elhakeem, A. , S. Ahluwalia, S. , & Attalla, M. . (2012). MOST-FIT: Support techniques for inspection and life cycle optimization in building asset management. Computer-Aided Civil and Infrastructure Engineering, 27, 130-142. doi:10.1111/j.1467-8667.2011.00729.x
Hegazy, T. . (2011). Discussion of "time-profit trade-off analysis for construction projects" by Ahmed Senouci and Khaled El-Rayes. Journal of Construction Engineering and Management, 137, 96-97. doi:10.1061/(ASCE)CO.1943-7862.0000173
Hegazy, T. , Said, M. , & Kassab, M. . (2011). Incorporating rework into construction schedule analysis. Automation in Construction, 20, 1051-1059. doi:10.1016/j.autcon.2011.04.006