Publications
Flexible Activity Relations to Support Optimum Schedule Acceleration. Journal of Construction Engineering and Management, 142. doi:10.1061/(ASCE)CO.1943-7862.0001193
. (2016). Flowchart-based simulation of construction operations. In AACE International. Transactions of the Annual Meeting. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0031625658&partnerID=40&md5=29fc489dffdfdd95dff01c1c0574d621
. (1998). Genetic optimization for dynamic project control. Journal of Construction Engineering and Management, 129, 396-404. doi:10.1061/(ASCE)0733-9364(2003)129:4(396)
. (2003). Genetic optimization of site layout planning. In AACE International. Transactions of the Annual Meeting (p. IT.05.1-IT.05.8). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-18144449295&partnerID=40&md5=c7fca9737c98e3c125645ccc8e518b91
. (1999). Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131, 168-175. doi:10.1061/(ASCE)0733-9364(2005)131:2(168)
. (2005). Hands-on exercise for enhancing students' construction management skills. Journal of Construction Engineering and Management, 139, 1135-1143. doi:10.1061/(ASCE)CO.1943-7862.0000705
. (2013). Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138, 688-696. doi:10.1061/(ASCE)CO.1943-7862.0000483
. (2012). Holistic analysis of infrastructure deterioration and rehabilitation using system dynamics. Journal of Infrastructure Systems, 22. doi:10.1061/(ASCE)IS.1943-555X.0000273
. (2016). A hybrid-based system for site layout planning in construction. Computer-Aided Civil and Infrastructure Engineering, 16, 79-93. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0035052778&partnerID=40&md5=929d005a7096d2f79cf324330769f59c
. (2001). Improving design coordination for building projects. I: Information model. Journal of Construction Engineering and Management, 127, 322-329. doi:10.1061/(ASCE)0733-9364(2001)127:4(322)
. (2001). Improving design coordination for building projects. II: A collaborative system. Journal of Construction Engineering and Management, 127, 330-336. doi:10.1061/(ASCE)0733-9364(2001)127:4(330)
. (2001). Incorporating rework into construction schedule analysis. Automation in Construction, 20, 1051-1059. doi:10.1016/j.autcon.2011.04.006
. (2011). In-house delivery of multiple-small reconstruction projects. Journal of Management in Engineering, 20, 25-31. doi:10.1061/(ASCE)0742-597X(2004)20:1(25)
. (2004). Integrated multiple-element bridge management system. Journal of Bridge Engineering, 14, 179-187. doi:10.1061/(ASCE)1084-0702(2009)14:3(179)
. (2009). Large-scale asset renewal optimization using genetic algorithms plus segmentation. Journal of Computing in Civil Engineering, 27, 419-426. doi:10.1061/(ASCE)CP.1943-5487.0000249
. (2013). Microeconomic optimization and what-if analysis for facilities renewal. Journal of Facilities Management, 13, 350-365. doi:10.1108/JFM-10-2014-0034
. (2015). A microeconomic perspective on infrastructure rehabilitation. Construction Management and Economics, 32, 433-445. doi:10.1080/01446193.2013.879193
. (2014). Microeconomics for infrastructure rehabilitation. In Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress (pp. 1279-1288). doi:10.1061/9780784413517.0131
. (2014). Modified but-for method for delay analysis. Journal of Construction Engineering and Management, 131, 1142-1144. doi:10.1061/(ASCE)0733-9364(2005)131:10(1142)
. (2005). MOST-FIT: Support techniques for inspection and life cycle optimization in building asset management. Computer-Aided Civil and Infrastructure Engineering, 27, 130-142. doi:10.1111/j.1467-8667.2011.00729.x
. (2012).