Publications
Multicriteria assessment and prioritization of hospital renewal needs. Journal of Performance of Constructed Facilities, 28, 528-538. doi:10.1061/(ASCE)CF.1943-5509.0000455
. (2014). Multi-criteria decision analysis for infrastructure privatisation using conflict resolution. Structure and Infrastructure Engineering, 7, 661-671. doi:10.1080/15732470802677649
. (2011). Multimode resource-constrained scheduling and leveling for practical-size projects. Journal of Management in Engineering, 31. doi:10.1061/(ASCE)ME.1943-5479.0000338
. (2015). Multiple criteria decision support for infrastructure privatization. In Congress on Computing in Civil Engineering, Proceedings (pp. 558-565). doi:10.1061/40937(261)66
. (2007). Multiple optimization and segmentation technique (MOST) for large-scale bilevel life cycle optimization. Canadian Journal of Civil Engineering, 38, 263-271. doi:10.1139/L10-134
. (2011). Multiple-Criteria BIM-based evaluation of architectural submittals. International Journal of Mathematical Models and Methods in Applied Sciences, 9, 453-462. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-84938384749&partnerID=40&md5=a7e5d8e9c68c6556317ba9b466af580e
. (2015). Negotiation characteristics in brownfield redevelopment projects. In Conference Proceedings - IEEE International Conference on Systems, Man and Cybernetics (pp. 1866-1871). doi:10.1109/ICSMC.2007.4414193
. (2007). Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management, 125, 167-175. doi:10.1061/(ASCE)0733-9364(1999)125:3(167)
. (1999). Practical cost estimation in a competitive environment. In Transactions of the American Association of Cost Engineers (p. H.5.1-H.5.9). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0025846078&partnerID=40&md5=468b6a346233b1cb9623fbb570881cd5
. (1991). Project performance control in reconstruction projects. Journal of Construction Engineering and Management, 126, 137-141. doi:10.1061/(ASCE)0733-9364(2000)126:2(137)
. (2000). Prospects of mind maps for better visualization of infrastructure literature. Journal of Professional Issues in Engineering Education and Practice, 137, 239-247. doi:10.1061/(ASCE)EI.1943-5541.0000072
. (2011). Reconstruction of the building infrastructure: Two performance prediction models. Journal of Infrastructure Systems, 9, 26-34. doi:10.1061/(ASCE)1076-0342(2003)9:1(26)
. (2003). Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management, 129, 698-705. doi:10.1061/(ASCE)0733-9364(2003)129:6(698)
. (2003). Roof deterioration and impact: A questionnaire survey. Journal of Retail and Leisure Property, 9, 337-348. doi:10.1057/rlp.2010.18
. (2010). Simplified project management for construction practitioners. Cost Engineering (Morgantown, West Virginia), 48, 20-28. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-33751371489&partnerID=40&md5=9925257869b4032983bfc945e5f91c3a
. (2006). Simplified spreadsheet solutions: I: Subcontractor information system. Journal of Construction Engineering and Management, 127, 461-468. doi:10.1061/(ASCE)0733-9364(2001)127:6(461)
. (2001). Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127, 469-475. doi:10.1061/(ASCE)0733-9364(2001)127:6(469)
. (2001). Strategic policy analysis for infrastructure rehabilitation using system dynamics. Structure and Infrastructure Engineering, 12, 667-681. doi:10.1080/15732479.2015.1038723
. (2016). Success of reconstruction projects: A statistical investigation. Cost Engineering (Morgantown, West Virginia), 45, 25-31. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-75849131453&partnerID=40&md5=ecb35253b7725a7806f9f4550319f1b7
. (2003). System of multiple ANNs for online planning of numerous building improvements. Journal of Construction Engineering and Management, 134, 342-351. doi:10.1061/(ASCE)0733-9364(2008)134:5(342)
. (2008).