Hegazy, T. , & Zhang, K. . (2005). Daily windows delay analysis. Journal of Construction Engineering and Management, 131, 505-512. doi:10.1061/(ASCE)0733-9364(2005)131:5(505)
Minocha, V. K. , & Hegazy, T. . (2005). Discussion of "Reconstruction of the building infrastructure: Two performance prediction models" by Mohamed Attalla, Tarek Hegazy, and Ralph Haas. Journal of Infrastructure Systems, 11, 268-269. doi:10.1061/(ASCE)1076-0342(2005)11:4(268)
Elhakeem, A. , & Hegazy, T. . (2005). Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131, 168-175. doi:10.1061/(ASCE)0733-9364(2005)131:2(168)
Mbabazi, A. , Hegazy, T. , & Saccomanno, F. . (2005). Modified but-for method for delay analysis. Journal of Construction Engineering and Management, 131, 1142-1144. doi:10.1061/(ASCE)0733-9364(2005)131:10(1142)
Hegazy, T. , Elhakeem, A. , & Elbeltagi, E. . (2004). Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130, 160-167. doi:10.1061/(ASCE)0733-9364(2004)130:2(160)
Attalla, M. , Hegazy, T. , & Elbeltagi, E. . (2004). In-house delivery of multiple-small reconstruction projects. Journal of Management in Engineering, 20, 25-31. doi:10.1061/(ASCE)0742-597X(2004)20:1(25)
Elbeltagi, E. , Hegazy, T. , & Eldosouky, A. . (2004). Dynamic layout of construction temporary facilities considering safety. Journal of Construction Engineering and Management, 130, 534-541. doi:10.1061/(ASCE)0733-9364(2004)130:4(534)
Morcous, G. , & Hegazy, T. . (2003). Discussion of "Improving design coordination for building projects. I: Information model" by Tarek Hegazy, Essam Zaneldin, and Donald Grierson. Journal of Construction Engineering and Management, 129, 470-471. doi:10.1061/(ASCE)0733-9364(2003)129:4(470)
Hegazy, T. , & Petzold, K. . (2003). Genetic optimization for dynamic project control. Journal of Construction Engineering and Management, 129, 396-404. doi:10.1061/(ASCE)0733-9364(2003)129:4(396)
Attalla, M. , Hegazy, T. , & Haas, R. . (2003). Reconstruction of the building infrastructure: Two performance prediction models. Journal of Infrastructure Systems, 9, 26-34. doi:10.1061/(ASCE)1076-0342(2003)9:1(26)
Hegazy, T. , & Kassab, M. . (2003). Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management, 129, 698-705. doi:10.1061/(ASCE)0733-9364(2003)129:6(698)
Attalla, M. , & Hegazy, T. . (2003). Success of reconstruction projects: A statistical investigation. Cost Engineering (Morgantown, West Virginia), 45, 25-31. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-75849131453&partnerID=40&md5=ecb35253b7725a7806f9f4550319f1b7
Hegazy, T. , & Wassef, N. . (2001). Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127, 183-191. doi:10.1061/(ASCE)0733-9364(2001)127:3(183)
Elbeltagi, E. , & Hegazy, T. . (2001). A hybrid-based system for site layout planning in construction. Computer-Aided Civil and Infrastructure Engineering, 16, 79-93. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0035052778&partnerID=40&md5=929d005a7096d2f79cf324330769f59c
Zaneldin, E. , Hegazy, T. , & Grierson, D. . (2001). Improving design coordination for building projects. II: A collaborative system. Journal of Construction Engineering and Management, 127, 330-336. doi:10.1061/(ASCE)0733-9364(2001)127:4(330)
Hegazy, T. , Zaneldin, E. , & Grierson, D. . (2001). Improving design coordination for building projects. I: Information model. Journal of Construction Engineering and Management, 127, 322-329. doi:10.1061/(ASCE)0733-9364(2001)127:4(322)
Hegazy, T. , & Ersahin, T. . (2001). Simplified spreadsheet solutions: I: Subcontractor information system. Journal of Construction Engineering and Management, 127, 461-468. doi:10.1061/(ASCE)0733-9364(2001)127:6(461)
Hegazy, T. , & Ersahin, T. . (2001). Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127, 469-475. doi:10.1061/(ASCE)0733-9364(2001)127:6(469)
Hegazy, T. , Shabeeb, A. K. , Elbeltagi, E. , & Cheema, T. . (2000). Algorithm for scheduling with multiskilled constrained resources. Journal of Construction Engineering and Management, 126, 414-421. doi:10.1061/(ASCE)0733-9364(2000)126:6(414)
McKim, R. , Hegazy, T. , & Attalla, M. . (2000). Project performance control in reconstruction projects. Journal of Construction Engineering and Management, 126, 137-141. doi:10.1061/(ASCE)0733-9364(2000)126:2(137)