Publications
Enhancing the critical path segments scheduling technique for project control. Canadian Journal of Civil Engineering, 39, 968-977. doi:10.1139/L2012-024
. (2012). Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138, 688-696. doi:10.1061/(ASCE)CO.1943-7862.0000483
. (2012). MOST-FIT: Support techniques for inspection and life cycle optimization in building asset management. Computer-Aided Civil and Infrastructure Engineering, 27, 130-142. doi:10.1111/j.1467-8667.2011.00729.x
. (2012). Enhancing construction as-built documentation using interactive voice response. Journal of Construction Engineering and Management, 139, 895-898. doi:10.1061/(ASCE)CO.1943-7862.0000648
. (2013). Fast and near-optimum schedule optimization for large-scale projects. Journal of Construction Engineering and Management, 139, 1117-1124. doi:10.1061/(ASCE)CO.1943-7862.0000722
. (2013). Hands-on exercise for enhancing students' construction management skills. Journal of Construction Engineering and Management, 139, 1135-1143. doi:10.1061/(ASCE)CO.1943-7862.0000705
. (2013). Large-scale asset renewal optimization using genetic algorithms plus segmentation. Journal of Computing in Civil Engineering, 27, 419-426. doi:10.1061/(ASCE)CP.1943-5487.0000249
. (2013). Discussion of "ant colony optimization for multimode resource-constrained project scheduling" by Hong Zhang. Journal of Management in Engineering, 30. doi:10.1061/(ASCE)ME.1943-5479.0000190
. (2014). A microeconomic perspective on infrastructure rehabilitation. Construction Management and Economics, 32, 433-445. doi:10.1080/01446193.2013.879193
. (2014). Microeconomics for infrastructure rehabilitation. In Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress (pp. 1279-1288). doi:10.1061/9780784413517.0131
. (2014). Multicriteria assessment and prioritization of hospital renewal needs. Journal of Performance of Constructed Facilities, 28, 528-538. doi:10.1061/(ASCE)CF.1943-5509.0000455
. (2014). Behavioral economic concepts for funding infrastructure rehabilitation. Journal of Management in Engineering, 31. doi:10.1061/(ASCE)ME.1943-5479.0000332
. (2015). Multimode resource-constrained scheduling and leveling for practical-size projects. Journal of Management in Engineering, 31. doi:10.1061/(ASCE)ME.1943-5479.0000338
. (2015). Capital renewal optimisation for large-scale infrastructure networks: genetic algorithms versus advanced mathematical tools. Structure and Infrastructure Engineering, 11, 253-262. doi:10.1080/15732479.2013.866968
. (2015). Dynamic System for Prioritizing and Accelerating Inspections to Support Capital Renewal of Buildings. Journal of Computing in Civil Engineering, 29. doi:10.1061/(ASCE)CP.1943-5487.0000351
. (2015). Enhanced benefit-cost analysis for infrastructure fund allocation. Canadian Journal of Civil Engineering, 42, 89-97. doi:10.1139/cjce-2014-0281
. (2015). Microeconomic optimization and what-if analysis for facilities renewal. Journal of Facilities Management, 13, 350-365. doi:10.1108/JFM-10-2014-0034
. (2015). Multiple-Criteria BIM-based evaluation of architectural submittals. International Journal of Mathematical Models and Methods in Applied Sciences, 9, 453-462. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-84938384749&partnerID=40&md5=a7e5d8e9c68c6556317ba9b466af580e
. (2015). Flexible Activity Relations to Support Optimum Schedule Acceleration. Journal of Construction Engineering and Management, 142. doi:10.1061/(ASCE)CO.1943-7862.0001193
. (2016). Holistic analysis of infrastructure deterioration and rehabilitation using system dynamics. Journal of Infrastructure Systems, 22. doi:10.1061/(ASCE)IS.1943-555X.0000273
. (2016).