Publications
Algorithm for scheduling with multiskilled constrained resources. Journal of Construction Engineering and Management, 126, 414-421. doi:10.1061/(ASCE)0733-9364(2000)126:6(414)
. (2000). Apportioning concurrent delays and accelerations using daily windows. In Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress (pp. 787-796). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-27644552935&partnerID=40&md5=09f97f19d6b7ace6add644f5569fc80b
. (2005). Attitude-based negotiation methodology for the management of construction disputes. Journal of Management in Engineering, 26, 114-122. doi:10.1061/(ASCE)ME.1943-5479.0000013
. (2010). Behavioral economic concepts for funding infrastructure rehabilitation. Journal of Management in Engineering, 31. doi:10.1061/(ASCE)ME.1943-5479.0000332
. (2015). Better visualization for multiple-site infrastructure programs using GIS. Solid Mechanics and its Applications, 140, 793-800. doi:10.1007/1-4020-4891-2_67
. (2006). Building asset management with deficiency tracking and integrated life cycle optimisation. Structure and Infrastructure Engineering, 8, 729-738. doi:10.1080/15732471003777071
. (2012). Capital renewal optimisation for large-scale infrastructure networks: genetic algorithms versus advanced mathematical tools. Structure and Infrastructure Engineering, 11, 253-262. doi:10.1080/15732479.2013.866968
. (2015). Closure to critical path segments scheduling technique by Tarek Hegazy and Wail Menesi. Journal of Construction Engineering and Management, 138, 788-789. doi:10.1061/(ASCE)CO.1943-7862.0000541
. (2012). Closure to “reconstruction of the building infrastructure: Two performance prediction models”. Journal of Infrastructure Systems, 11, 269-269. doi:10.1061/(ASCE)1076-0342(2005)11:4(269)
. (2005). Comparison among five evolutionary-based optimization algorithms. Advanced Engineering Informatics, 19, 43-53. doi:10.1016/j.aei.2005.01.004
. (2005). Comparison of two evolutionary algorithms for optimization of bridge deck repairs. Computer-Aided Civil and Infrastructure Engineering, 21, 561-572. doi:10.1111/j.1467-8667.2006.00458.x
. (2006). Computational intelligence tools for solving the facilities layout planning problem. In Proceedings of the American Control Conference (Vol. 6, pp. 3954-3958). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0034539982&partnerID=40&md5=c1cca7eac81041576416198ccca46911
. (2000). Computerized DSS for construction conflict resolution under uncertainty. Journal of Construction Engineering and Management, 136, 1249-1257. doi:10.1061/(ASCE)CO.1943-7862.0000239
. (2010). Computerized system for efficient delivery of infrastructure maintenance/repair programs. Journal of Construction Engineering and Management, 132, 26-34. doi:10.1061/(ASCE)0733-9364(2006)132:1(26)
. (2006). Conflict resolution in construction disputes using the graph model. Journal of Construction Engineering and Management, 132, 1043-1052. doi:10.1061/(ASCE)0733-9364(2006)132:10(1043)
. (2006). Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127, 183-191. doi:10.1061/(ASCE)0733-9364(2001)127:3(183)
. (2001). Critical path segments scheduling technique. Journal of Construction Engineering and Management, 136, 1078-1085. doi:10.1061/(ASCE)CO.1943-7862.0000212
. (2010). Daily windows delay analysis. Journal of Construction Engineering and Management, 131, 505-512. doi:10.1061/(ASCE)0733-9364(2005)131:5(505)
. (2005). Delay analysis considering dynamic resource allocation and multiple baselines. In AACE International Transactions. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-57449103378&partnerID=40&md5=83d0f366ea519fceafe63c18618dc9f0
. (2008). Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134, 575-582. doi:10.1061/(ASCE)0733-9364(2008)134:8(575)
. (2008).