Microeconomics for infrastructure rehabilitation. In Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress (pp. 1279-1288). doi:10.1061/9780784413517.0131
. (2014). Delay analysis considering dynamic resource allocation and multiple baselines. In AACE International Transactions. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-57449103378&partnerID=40&md5=83d0f366ea519fceafe63c18618dc9f0
. (2008). Delay analysis under multiple baseline updates. In AACE International Transactions (p. CDR.19.1-CDR.19.8). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-55849142618&partnerID=40&md5=78274ab69eb3af8d106b6925d399fdfe
. (2007). Multiple criteria decision support for infrastructure privatization. In Congress on Computing in Civil Engineering, Proceedings (pp. 558-565). doi:10.1061/40937(261)66
. (2007). Negotiation characteristics in brownfield redevelopment projects. In Conference Proceedings - IEEE International Conference on Systems, Man and Cybernetics (pp. 1866-1871). doi:10.1109/ICSMC.2007.4414193
. (2007). Uncertainty analysis in construction conflict resolution using information-gap theory. In Conference Proceedings - IEEE International Conference on Systems, Man and Cybernetics (pp. 1842-1847). doi:10.1109/ICSMC.2007.4414041
. (2007). Apportioning concurrent delays and accelerations using daily windows. In Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress (pp. 787-796). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-27644552935&partnerID=40&md5=09f97f19d6b7ace6add644f5569fc80b
. (2005). Evolutionary algorithms for optimizing bridge deck rehabilitation. In Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering (pp. 619-630). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-27144472763&partnerID=40&md5=4da109681d4762aebab3b3f52f26cd04
. (2005). Computational intelligence tools for solving the facilities layout planning problem. In Proceedings of the American Control Conference (Vol. 6, pp. 3954-3958). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0034539982&partnerID=40&md5=c1cca7eac81041576416198ccca46911
. (2000). Genetic optimization of site layout planning. In AACE International. Transactions of the Annual Meeting (p. IT.05.1-IT.05.8). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-18144449295&partnerID=40&md5=c7fca9737c98e3c125645ccc8e518b91
. (1999). Flowchart-based simulation of construction operations. In AACE International. Transactions of the Annual Meeting. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0031625658&partnerID=40&md5=29fc489dffdfdd95dff01c1c0574d621
. (1998). Expert rules-of-thumb for effective design coordination. In AACE International. Transactions of the Annual Meeting. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0029708513&partnerID=40&md5=cc65b0632d54f6a529cc1d6de25701ca
. (1996). Practical cost estimation in a competitive environment. In Transactions of the American Association of Cost Engineers (p. H.5.1-H.5.9). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0025846078&partnerID=40&md5=468b6a346233b1cb9623fbb570881cd5
. (1991). Economic optimization for the rehabilitation of co-located mixed assets. Canadian Journal of Civil Engineering, 44, 820-828. doi:10.1139/cjce-2016-0509
. (2017). Flexible Activity Relations to Support Optimum Schedule Acceleration. Journal of Construction Engineering and Management, 142. doi:10.1061/(ASCE)CO.1943-7862.0001193
. (2016). Holistic analysis of infrastructure deterioration and rehabilitation using system dynamics. Journal of Infrastructure Systems, 22. doi:10.1061/(ASCE)IS.1943-555X.0000273
. (2016). Strategic policy analysis for infrastructure rehabilitation using system dynamics. Structure and Infrastructure Engineering, 12, 667-681. doi:10.1080/15732479.2015.1038723
. (2016). Work-Package Planning and Schedule Optimization for Projects with Evolving Constraints. Journal of Computing in Civil Engineering, 30. doi:10.1061/(ASCE)CP.1943-5487.0000587
. (2016). Behavioral economic concepts for funding infrastructure rehabilitation. Journal of Management in Engineering, 31. doi:10.1061/(ASCE)ME.1943-5479.0000332
. (2015). Multimode resource-constrained scheduling and leveling for practical-size projects. Journal of Management in Engineering, 31. doi:10.1061/(ASCE)ME.1943-5479.0000338
. (2015).