Publications
Project performance control in reconstruction projects. Journal of Construction Engineering and Management, 126, 137-141. doi:10.1061/(ASCE)0733-9364(2000)126:2(137)
. (2000). Modified but-for method for delay analysis. Journal of Construction Engineering and Management, 131, 1142-1144. doi:10.1061/(ASCE)0733-9364(2005)131:10(1142)
. (2005). Multi-criteria decision analysis for infrastructure privatisation using conflict resolution. Structure and Infrastructure Engineering, 7, 661-671. doi:10.1080/15732470802677649
. (2011). Computerized DSS for construction conflict resolution under uncertainty. Journal of Construction Engineering and Management, 136, 1249-1257. doi:10.1061/(ASCE)CO.1943-7862.0000239
. (2010). Uncertainty analysis in construction conflict resolution using information-gap theory. In Conference Proceedings - IEEE International Conference on Systems, Man and Cybernetics (pp. 1842-1847). doi:10.1109/ICSMC.2007.4414041
. (2007). Multiple criteria decision support for infrastructure privatization. In Congress on Computing in Civil Engineering, Proceedings (pp. 558-565). doi:10.1061/40937(261)66
. (2007). Conflict resolution in construction disputes using the graph model. Journal of Construction Engineering and Management, 132, 1043-1052. doi:10.1061/(ASCE)0733-9364(2006)132:10(1043)
. (2006). Computational intelligence tools for solving the facilities layout planning problem. In Proceedings of the American Control Conference (Vol. 6, pp. 3954-3958). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0034539982&partnerID=40&md5=c1cca7eac81041576416198ccca46911
. (2000). Dynamic System for Prioritizing and Accelerating Inspections to Support Capital Renewal of Buildings. Journal of Computing in Civil Engineering, 29. doi:10.1061/(ASCE)CP.1943-5487.0000351
. (2015). A microeconomic perspective on infrastructure rehabilitation. Construction Management and Economics, 32, 433-445. doi:10.1080/01446193.2013.879193
. (2014). Large-scale asset renewal optimization using genetic algorithms plus segmentation. Journal of Computing in Civil Engineering, 27, 419-426. doi:10.1061/(ASCE)CP.1943-5487.0000249
. (2013). Hands-on exercise for enhancing students' construction management skills. Journal of Construction Engineering and Management, 139, 1135-1143. doi:10.1061/(ASCE)CO.1943-7862.0000705
. (2013). MOST-FIT: Support techniques for inspection and life cycle optimization in building asset management. Computer-Aided Civil and Infrastructure Engineering, 27, 130-142. doi:10.1111/j.1467-8667.2011.00729.x
. (2012). Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138, 688-696. doi:10.1061/(ASCE)CO.1943-7862.0000483
. (2012). Enhancing the critical path segments scheduling technique for project control. Canadian Journal of Civil Engineering, 39, 968-977. doi:10.1139/L2012-024
. (2012). Email-based system for documenting construction as-built details. Automation in Construction, 24, 130-137. doi:10.1016/j.autcon.2012.02.014
. (2012). Closure to critical path segments scheduling technique by Tarek Hegazy and Wail Menesi. Journal of Construction Engineering and Management, 138, 788-789. doi:10.1061/(ASCE)CO.1943-7862.0000541
. (2012). Discussion of "time-profit trade-off analysis for construction projects" by Ahmed Senouci and Khaled El-Rayes. Journal of Construction Engineering and Management, 137, 96-97. doi:10.1061/(ASCE)CO.1943-7862.0000173
. (2011). Prospects of mind maps for better visualization of infrastructure literature. Journal of Professional Issues in Engineering Education and Practice, 137, 239-247. doi:10.1061/(ASCE)EI.1943-5541.0000072
. (2011). Multiple optimization and segmentation technique (MOST) for large-scale bilevel life cycle optimization. Canadian Journal of Civil Engineering, 38, 263-271. doi:10.1139/L10-134
. (2011).