Publications

Search
Author [ Title(Asc)] Type Year
M
Menesi, W. , & Hegazy, T. . (2015). Multimode resource-constrained scheduling and leveling for practical-size projects. Journal of Management in Engineering, 31. doi:10.1061/(ASCE)ME.1943-5479.0000338
Kassab, M. , Hipel, K. , & Hegazy, T. . (2011). Multi-criteria decision analysis for infrastructure privatisation using conflict resolution. Structure and Infrastructure Engineering, 7, 661-671. doi:10.1080/15732470802677649
Ali, A. , & Hegazy, T. . (2014). Multicriteria assessment and prioritization of hospital renewal needs. Journal of Performance of Constructed Facilities, 28, 528-538. doi:10.1061/(ASCE)CF.1943-5509.0000455
Hegazy, T. , Elhakeem, A. , S. Ahluwalia, S. , & Attalla, M. . (2012). MOST-FIT: Support techniques for inspection and life cycle optimization in building asset management. Computer-Aided Civil and Infrastructure Engineering, 27, 130-142. doi:10.1111/j.1467-8667.2011.00729.x
Mbabazi, A. , Hegazy, T. , & Saccomanno, F. . (2005). Modified but-for method for delay analysis. Journal of Construction Engineering and Management, 131, 1142-1144. doi:10.1061/(ASCE)0733-9364(2005)131:10(1142)
Saad, D. A. , & Hegazy, T. . (2014). Microeconomics for infrastructure rehabilitation. In Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress (pp. 1279-1288). doi:10.1061/9780784413517.0131
Hegazy, T. , & Saad, D. A. . (2014). A microeconomic perspective on infrastructure rehabilitation. Construction Management and Economics, 32, 433-445. doi:10.1080/01446193.2013.879193
Saad, D. A. , & Hegazy, T. . (2015). Microeconomic optimization and what-if analysis for facilities renewal. Journal of Facilities Management, 13, 350-365. doi:10.1108/JFM-10-2014-0034
L
Hegazy, T. , & Rashedi, R. . (2013). Large-scale asset renewal optimization using genetic algorithms plus segmentation. Journal of Computing in Civil Engineering, 27, 419-426. doi:10.1061/(ASCE)CP.1943-5487.0000249
I
Elbehairy, H. , Hegazy, T. , & Soudki, K. . (2009). Integrated multiple-element bridge management system. Journal of Bridge Engineering, 14, 179-187. doi:10.1061/(ASCE)1084-0702(2009)14:3(179)
Attalla, M. , Hegazy, T. , & Elbeltagi, E. . (2004). In-house delivery of multiple-small reconstruction projects. Journal of Management in Engineering, 20, 25-31. doi:10.1061/(ASCE)0742-597X(2004)20:1(25)
Hegazy, T. , Said, M. , & Kassab, M. . (2011). Incorporating rework into construction schedule analysis. Automation in Construction, 20, 1051-1059. doi:10.1016/j.autcon.2011.04.006
Zaneldin, E. , Hegazy, T. , & Grierson, D. . (2001). Improving design coordination for building projects. II: A collaborative system. Journal of Construction Engineering and Management, 127, 330-336. doi:10.1061/(ASCE)0733-9364(2001)127:4(330)
Hegazy, T. , Zaneldin, E. , & Grierson, D. . (2001). Improving design coordination for building projects. I: Information model. Journal of Construction Engineering and Management, 127, 322-329. doi:10.1061/(ASCE)0733-9364(2001)127:4(322)
H
Elbeltagi, E. , & Hegazy, T. . (2001). A hybrid-based system for site layout planning in construction. Computer-Aided Civil and Infrastructure Engineering, 16, 79-93. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0035052778&partnerID=40&md5=929d005a7096d2f79cf324330769f59c
Rashedi, R. , & Hegazy, T. . (2016). Holistic analysis of infrastructure deterioration and rehabilitation using system dynamics. Journal of Infrastructure Systems, 22. doi:10.1061/(ASCE)IS.1943-555X.0000273
Hegazy, T. , & Menesi, W. . (2012). Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138, 688-696. doi:10.1061/(ASCE)CO.1943-7862.0000483
Hegazy, T. , Abdel-Monem, M. , Saad, D. A. , & Rashedi, R. . (2013). Hands-on exercise for enhancing students' construction management skills. Journal of Construction Engineering and Management, 139, 1135-1143. doi:10.1061/(ASCE)CO.1943-7862.0000705
G
Elhakeem, A. , & Hegazy, T. . (2005). Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131, 168-175. doi:10.1061/(ASCE)0733-9364(2005)131:2(168)
Elbeltagi, E. , & Hegazy, T. M. . (1999). Genetic optimization of site layout planning. In AACE International. Transactions of the Annual Meeting (p. IT.05.1-IT.05.8). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-18144449295&partnerID=40&md5=c7fca9737c98e3c125645ccc8e518b91

Pages