Publications

Search
[ Author(Asc)] Title Type Year
H
Hegazy, T. , Said, M. , & Kassab, M. . (2011). Incorporating rework into construction schedule analysis. Automation in Construction, 20, 1051-1059. doi:10.1016/j.autcon.2011.04.006
Hegazy, T. , S. Ahluwalia, S. , & Attalla, M. . (2010). Two condition indicators for building components based on reactive-maintenance data. Journal of Facilities Management, 8, 64-74. doi:10.1108/14725961011019085
Hegazy, T. . (2010). Discussion of "permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling" by Jin-Lee Kim and Ralph D. Ellis Jr. Journal of Construction Engineering and Management, 136, 717-718. doi:10.1061/(ASCE)CO.1943-7862.0000075
Hegazy, T. , & Menesi, W. . (2010). Critical path segments scheduling technique. Journal of Construction Engineering and Management, 136, 1078-1085. doi:10.1061/(ASCE)CO.1943-7862.0000212
Hegazy, T. , & Kamarah, E. . (2008). Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134, 253-264. doi:10.1061/(ASCE)0733-9364(2008)134:4(253)
Hegazy, T. , & Menesi, W. . (2008). Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134, 575-582. doi:10.1061/(ASCE)0733-9364(2008)134:8(575)
Hegazy, T. M. , & Menesi, W. . (2008). Delay analysis considering dynamic resource allocation and multiple baselines. In AACE International Transactions. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-57449103378&partnerID=40&md5=83d0f366ea519fceafe63c18618dc9f0
Hegazy, T. M. , & Menesi, W. . (2007). Delay analysis under multiple baseline updates. In AACE International Transactions (p. CDR.19.1-CDR.19.8). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-55849142618&partnerID=40&md5=78274ab69eb3af8d106b6925d399fdfe
Hegazy, T. . (2006). Computerized system for efficient delivery of infrastructure maintenance/repair programs. Journal of Construction Engineering and Management, 132, 26-34. doi:10.1061/(ASCE)0733-9364(2006)132:1(26)
Hegazy, T. . (2006). Simplified project management for construction practitioners. Cost Engineering (Morgantown, West Virginia), 48, 20-28. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-33751371489&partnerID=40&md5=9925257869b4032983bfc945e5f91c3a
Hegazy, T. . (2006). Better visualization for multiple-site infrastructure programs using GIS. Solid Mechanics and its Applications, 140, 793-800. doi:10.1007/1-4020-4891-2_67
Hegazy, T. , & Zhang, K. . (2005). Daily windows delay analysis. Journal of Construction Engineering and Management, 131, 505-512. doi:10.1061/(ASCE)0733-9364(2005)131:5(505)
Hegazy, T. . (2005). Closure to “reconstruction of the building infrastructure: Two performance prediction models”. Journal of Infrastructure Systems, 11, 269-269. doi:10.1061/(ASCE)1076-0342(2005)11:4(269)
Hegazy, T. , Elhakeem, A. , & Elbeltagi, E. . (2004). Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130, 160-167. doi:10.1061/(ASCE)0733-9364(2004)130:2(160)
Hegazy, T. , & Kassab, M. . (2003). Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management, 129, 698-705. doi:10.1061/(ASCE)0733-9364(2003)129:6(698)
Hegazy, T. , & Petzold, K. . (2003). Genetic optimization for dynamic project control. Journal of Construction Engineering and Management, 129, 396-404. doi:10.1061/(ASCE)0733-9364(2003)129:4(396)
Hegazy, T. , & Wassef, N. . (2001). Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127, 183-191. doi:10.1061/(ASCE)0733-9364(2001)127:3(183)
Hegazy, T. , & Ersahin, T. . (2001). Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127, 469-475. doi:10.1061/(ASCE)0733-9364(2001)127:6(469)
Hegazy, T. , & Ersahin, T. . (2001). Simplified spreadsheet solutions: I: Subcontractor information system. Journal of Construction Engineering and Management, 127, 461-468. doi:10.1061/(ASCE)0733-9364(2001)127:6(461)
Hegazy, T. , Zaneldin, E. , & Grierson, D. . (2001). Improving design coordination for building projects. I: Information model. Journal of Construction Engineering and Management, 127, 322-329. doi:10.1061/(ASCE)0733-9364(2001)127:4(322)

Pages