Publications

Search
Author Title [ Type(Asc)] Year
Journal Article
Hegazy, T. . (2006). Computerized system for efficient delivery of infrastructure maintenance/repair programs. Journal of Construction Engineering and Management, 132, 26-34. doi:10.1061/(ASCE)0733-9364(2006)132:1(26)
Hegazy, T. . (2006). Simplified project management for construction practitioners. Cost Engineering (Morgantown, West Virginia), 48, 20-28. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-33751371489&partnerID=40&md5=9925257869b4032983bfc945e5f91c3a
Kassab, M. , Hipel, K. , & Hegazy, T. . (2006). Conflict resolution in construction disputes using the graph model. Journal of Construction Engineering and Management, 132, 1043-1052. doi:10.1061/(ASCE)0733-9364(2006)132:10(1043)
Elbehairy, H. , Elbeltagi, E. , Hegazy, T. , & Soudki, K. . (2006). Comparison of two evolutionary algorithms for optimization of bridge deck repairs. Computer-Aided Civil and Infrastructure Engineering, 21, 561-572. doi:10.1111/j.1467-8667.2006.00458.x
Hegazy, T. . (2006). Better visualization for multiple-site infrastructure programs using GIS. Solid Mechanics and its Applications, 140, 793-800. doi:10.1007/1-4020-4891-2_67
Mbabazi, A. , Hegazy, T. , & Saccomanno, F. . (2005). Modified but-for method for delay analysis. Journal of Construction Engineering and Management, 131, 1142-1144. doi:10.1061/(ASCE)0733-9364(2005)131:10(1142)
Elhakeem, A. , & Hegazy, T. . (2005). Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131, 168-175. doi:10.1061/(ASCE)0733-9364(2005)131:2(168)
Minocha, V. K. , & Hegazy, T. . (2005). Discussion of "Reconstruction of the building infrastructure: Two performance prediction models" by Mohamed Attalla, Tarek Hegazy, and Ralph Haas. Journal of Infrastructure Systems, 11, 268-269. doi:10.1061/(ASCE)1076-0342(2005)11:4(268)
Hegazy, T. , & Zhang, K. . (2005). Daily windows delay analysis. Journal of Construction Engineering and Management, 131, 505-512. doi:10.1061/(ASCE)0733-9364(2005)131:5(505)
Elbeltagi, E. , Hegazy, T. , & Grierson, D. . (2005). Comparison among five evolutionary-based optimization algorithms. Advanced Engineering Informatics, 19, 43-53. doi:10.1016/j.aei.2005.01.004
Hegazy, T. . (2005). Closure to “reconstruction of the building infrastructure: Two performance prediction models”. Journal of Infrastructure Systems, 11, 269-269. doi:10.1061/(ASCE)1076-0342(2005)11:4(269)
Attalla, M. , Hegazy, T. , & Elbeltagi, E. . (2004). In-house delivery of multiple-small reconstruction projects. Journal of Management in Engineering, 20, 25-31. doi:10.1061/(ASCE)0742-597X(2004)20:1(25)
Hegazy, T. , Elhakeem, A. , & Elbeltagi, E. . (2004). Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130, 160-167. doi:10.1061/(ASCE)0733-9364(2004)130:2(160)
Elbeltagi, E. , Hegazy, T. , & Eldosouky, A. . (2004). Dynamic layout of construction temporary facilities considering safety. Journal of Construction Engineering and Management, 130, 534-541. doi:10.1061/(ASCE)0733-9364(2004)130:4(534)
Attalla, M. , & Hegazy, T. . (2003). Success of reconstruction projects: A statistical investigation. Cost Engineering (Morgantown, West Virginia), 45, 25-31. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-75849131453&partnerID=40&md5=ecb35253b7725a7806f9f4550319f1b7
Hegazy, T. , & Kassab, M. . (2003). Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management, 129, 698-705. doi:10.1061/(ASCE)0733-9364(2003)129:6(698)
Attalla, M. , Hegazy, T. , & Haas, R. . (2003). Reconstruction of the building infrastructure: Two performance prediction models. Journal of Infrastructure Systems, 9, 26-34. doi:10.1061/(ASCE)1076-0342(2003)9:1(26)
Hegazy, T. , & Petzold, K. . (2003). Genetic optimization for dynamic project control. Journal of Construction Engineering and Management, 129, 396-404. doi:10.1061/(ASCE)0733-9364(2003)129:4(396)
Morcous, G. , & Hegazy, T. . (2003). Discussion of "Improving design coordination for building projects. I: Information model" by Tarek Hegazy, Essam Zaneldin, and Donald Grierson. Journal of Construction Engineering and Management, 129, 470-471. doi:10.1061/(ASCE)0733-9364(2003)129:4(470)
Zaneldin, E. , Hegazy, T. , & Grierson, D. . (2001). Improving design coordination for building projects. II: A collaborative system. Journal of Construction Engineering and Management, 127, 330-336. doi:10.1061/(ASCE)0733-9364(2001)127:4(330)

Pages