Publications
Algorithm for scheduling with multiskilled constrained resources. Journal of Construction Engineering and Management, 126, 414-421. doi:10.1061/(ASCE)0733-9364(2000)126:6(414)
. (2000). Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management, 125, 167-175. doi:10.1061/(ASCE)0733-9364(1999)125:3(167)
. (1999). EvoSite: Evolution-based model for site layout planning. Journal of Computing in Civil Engineering, 13, 198-206. doi:10.1061/(ASCE)0887-3801(1999)13:3(198)
. (1999). Expert rules-of-thumb for effective design coordination. In AACE International. Transactions of the Annual Meeting. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0029708513&partnerID=40&md5=cc65b0632d54f6a529cc1d6de25701ca
. (1996). Elements of cost estimation: a survey in Canada and the United States. Cost Engineering (Morgantown, West Virginia), 37, 27-33. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0029296896&partnerID=40&md5=edb2cfd356b1d37fab5639376ab51fc7
. (1995). Building asset management with deficiency tracking and integrated life cycle optimisation. Structure and Infrastructure Engineering, 8, 729-738. doi:10.1080/15732471003777071
. (2012). Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131, 168-175. doi:10.1061/(ASCE)0733-9364(2005)131:2(168)
. (2005). Evolutionary algorithms for optimizing bridge deck rehabilitation. In Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering (pp. 619-630). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-27144472763&partnerID=40&md5=4da109681d4762aebab3b3f52f26cd04
. (2005). Comparison among five evolutionary-based optimization algorithms. Advanced Engineering Informatics, 19, 43-53. doi:10.1016/j.aei.2005.01.004
. (2005). Dynamic layout of construction temporary facilities considering safety. Journal of Construction Engineering and Management, 130, 534-541. doi:10.1061/(ASCE)0733-9364(2004)130:4(534)
. (2004). A hybrid-based system for site layout planning in construction. Computer-Aided Civil and Infrastructure Engineering, 16, 79-93. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0035052778&partnerID=40&md5=929d005a7096d2f79cf324330769f59c
. (2001). Genetic optimization of site layout planning. In AACE International. Transactions of the Annual Meeting (p. IT.05.1-IT.05.8). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-18144449295&partnerID=40&md5=c7fca9737c98e3c125645ccc8e518b91
. (1999). Integrated multiple-element bridge management system. Journal of Bridge Engineering, 14, 179-187. doi:10.1061/(ASCE)1084-0702(2009)14:3(179)
. (2009). Comparison of two evolutionary algorithms for optimization of bridge deck repairs. Computer-Aided Civil and Infrastructure Engineering, 21, 561-572. doi:10.1111/j.1467-8667.2006.00458.x
. (2006). In-house delivery of multiple-small reconstruction projects. Journal of Management in Engineering, 20, 25-31. doi:10.1061/(ASCE)0742-597X(2004)20:1(25)
. (2004). Success of reconstruction projects: A statistical investigation. Cost Engineering (Morgantown, West Virginia), 45, 25-31. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-75849131453&partnerID=40&md5=ecb35253b7725a7806f9f4550319f1b7
. (2003). Reconstruction of the building infrastructure: Two performance prediction models. Journal of Infrastructure Systems, 9, 26-34. doi:10.1061/(ASCE)1076-0342(2003)9:1(26)
. (2003). Multicriteria assessment and prioritization of hospital renewal needs. Journal of Performance of Constructed Facilities, 28, 528-538. doi:10.1061/(ASCE)CF.1943-5509.0000455
. (2014). Multiple-Criteria BIM-based evaluation of architectural submittals. International Journal of Mathematical Models and Methods in Applied Sciences, 9, 453-462. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-84938384749&partnerID=40&md5=a7e5d8e9c68c6556317ba9b466af580e
. (2015). Roof deterioration and impact: A questionnaire survey. Journal of Retail and Leisure Property, 9, 337-348. doi:10.1057/rlp.2010.18
. (2010).