Publications

Search
Author Title [ Type(Asc)] Year
Journal Article
Elbeltagi, E. , & Hegazy, T. . (2001). A hybrid-based system for site layout planning in construction. Computer-Aided Civil and Infrastructure Engineering, 16, 79-93. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0035052778&partnerID=40&md5=929d005a7096d2f79cf324330769f59c
Hegazy, T. , & Wassef, N. . (2001). Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127, 183-191. doi:10.1061/(ASCE)0733-9364(2001)127:3(183)
Hegazy, T. , & Ersahin, T. . (2001). Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127, 469-475. doi:10.1061/(ASCE)0733-9364(2001)127:6(469)
Hegazy, T. , & Ersahin, T. . (2001). Simplified spreadsheet solutions: I: Subcontractor information system. Journal of Construction Engineering and Management, 127, 461-468. doi:10.1061/(ASCE)0733-9364(2001)127:6(461)
Hegazy, T. , Zaneldin, E. , & Grierson, D. . (2001). Improving design coordination for building projects. I: Information model. Journal of Construction Engineering and Management, 127, 322-329. doi:10.1061/(ASCE)0733-9364(2001)127:4(322)
McKim, R. , Hegazy, T. , & Attalla, M. . (2000). Project performance control in reconstruction projects. Journal of Construction Engineering and Management, 126, 137-141. doi:10.1061/(ASCE)0733-9364(2000)126:2(137)
Hegazy, T. , Shabeeb, A. K. , Elbeltagi, E. , & Cheema, T. . (2000). Algorithm for scheduling with multiskilled constrained resources. Journal of Construction Engineering and Management, 126, 414-421. doi:10.1061/(ASCE)0733-9364(2000)126:6(414)
Hegazy, T. . (1999). Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management, 125, 167-175. doi:10.1061/(ASCE)0733-9364(1999)125:3(167)
Hegazy, T. , & Elbeltagi, E. . (1999). EvoSite: Evolution-based model for site layout planning. Journal of Computing in Civil Engineering, 13, 198-206. doi:10.1061/(ASCE)0887-3801(1999)13:3(198)
Hegazy, T. , & Moselhi, O. . (1995). Elements of cost estimation: a survey in Canada and the United States. Cost Engineering (Morgantown, West Virginia), 37, 27-33. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0029296896&partnerID=40&md5=edb2cfd356b1d37fab5639376ab51fc7
Conference Paper
Saad, D. A. , & Hegazy, T. . (2014). Microeconomics for infrastructure rehabilitation. In Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress (pp. 1279-1288). doi:10.1061/9780784413517.0131
Hegazy, T. M. , & Menesi, W. . (2008). Delay analysis considering dynamic resource allocation and multiple baselines. In AACE International Transactions. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-57449103378&partnerID=40&md5=83d0f366ea519fceafe63c18618dc9f0
Kassab, M. , Hipel, K. W. , & Hegazy, T. . (2007). Uncertainty analysis in construction conflict resolution using information-gap theory. In Conference Proceedings - IEEE International Conference on Systems, Man and Cybernetics (pp. 1842-1847). doi:10.1109/ICSMC.2007.4414041
Yousefi, S. , Hipel, K. W. , Hegazy, T. , Witmer, J. A. , & Gray, P. . (2007). Negotiation characteristics in brownfield redevelopment projects. In Conference Proceedings - IEEE International Conference on Systems, Man and Cybernetics (pp. 1866-1871). doi:10.1109/ICSMC.2007.4414193
Kassab, M. , Hegazy, T. , & Hipel, K. W. . (2007). Multiple criteria decision support for infrastructure privatization. In Congress on Computing in Civil Engineering, Proceedings (pp. 558-565). doi:10.1061/40937(261)66
Hegazy, T. M. , & Menesi, W. . (2007). Delay analysis under multiple baseline updates. In AACE International Transactions (p. CDR.19.1-CDR.19.8). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-55849142618&partnerID=40&md5=78274ab69eb3af8d106b6925d399fdfe
Elbeltagi, E. , Elbehairy, H. , Hegazy, T. , & Grierson, D. . (2005). Evolutionary algorithms for optimizing bridge deck rehabilitation. In Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering (pp. 619-630). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-27144472763&partnerID=40&md5=4da109681d4762aebab3b3f52f26cd04
Zhang, K. , & Hegazy, T. . (2005). Apportioning concurrent delays and accelerations using daily windows. In Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress (pp. 787-796). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-27644552935&partnerID=40&md5=09f97f19d6b7ace6add644f5569fc80b
Karray, F. , Zaneldin, E. , Hegazy, T. , Shabeeb, A. , & Elbeltagi, E. . (2000). Computational intelligence tools for solving the facilities layout planning problem. In Proceedings of the American Control Conference (Vol. 6, pp. 3954-3958). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0034539982&partnerID=40&md5=c1cca7eac81041576416198ccca46911
Elbeltagi, E. , & Hegazy, T. M. . (1999). Genetic optimization of site layout planning. In AACE International. Transactions of the Annual Meeting (p. IT.05.1-IT.05.8). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-18144449295&partnerID=40&md5=c7fca9737c98e3c125645ccc8e518b91

Pages