Publications

Search
[ Author(Asc)] Title Type Year
Z
Zhang, K. , & Hegazy, T. . (2005). Apportioning concurrent delays and accelerations using daily windows. In Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress (pp. 787-796). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-27644552935&partnerID=40&md5=09f97f19d6b7ace6add644f5569fc80b
Zaneldin, E. , Hegazy, T. , & Grierson, D. . (2001). Improving design coordination for building projects. II: A collaborative system. Journal of Construction Engineering and Management, 127, 330-336. doi:10.1061/(ASCE)0733-9364(2001)127:4(330)
Zaneldin, E. , & Hegazy, T. M. . (1998). Flowchart-based simulation of construction operations. In AACE International. Transactions of the Annual Meeting. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0031625658&partnerID=40&md5=29fc489dffdfdd95dff01c1c0574d621
Y
Yousefi, S. , Hipel, K. W. , & Hegazy, T. . (2010). Attitude-based negotiation methodology for the management of construction disputes. Journal of Management in Engineering, 26, 114-122. doi:10.1061/(ASCE)ME.1943-5479.0000013
Yousefi, S. , Hegazy, T. , Capuru̧o, R. A. C. , & Attalla, M. . (2008). System of multiple ANNs for online planning of numerous building improvements. Journal of Construction Engineering and Management, 134, 342-351. doi:10.1061/(ASCE)0733-9364(2008)134:5(342)
Yousefi, S. , Hipel, K. W. , Hegazy, T. , Witmer, J. A. , & Gray, P. . (2007). Negotiation characteristics in brownfield redevelopment projects. In Conference Proceedings - IEEE International Conference on Systems, Man and Cybernetics (pp. 1866-1871). doi:10.1109/ICSMC.2007.4414193
S
Saad, D. A. , & Hegazy, T. . (2017). Economic optimization for the rehabilitation of co-located mixed assets. Canadian Journal of Civil Engineering, 44, 820-828. doi:10.1139/cjce-2016-0509
Saad, D. A. , & Hegazy, T. . (2015). Behavioral economic concepts for funding infrastructure rehabilitation. Journal of Management in Engineering, 31. doi:10.1061/(ASCE)ME.1943-5479.0000332
Saad, D. A. , & Hegazy, T. . (2015). Microeconomic optimization and what-if analysis for facilities renewal. Journal of Facilities Management, 13, 350-365. doi:10.1108/JFM-10-2014-0034
Saad, D. A. , & Hegazy, T. . (2015). Enhanced benefit-cost analysis for infrastructure fund allocation. Canadian Journal of Civil Engineering, 42, 89-97. doi:10.1139/cjce-2014-0281
Saad, D. A. , & Hegazy, T. . (2014). Microeconomics for infrastructure rehabilitation. In Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress (pp. 1279-1288). doi:10.1061/9780784413517.0131
R
Rashedi, R. , & Hegazy, T. . (2016). Strategic policy analysis for infrastructure rehabilitation using system dynamics. Structure and Infrastructure Engineering, 12, 667-681. doi:10.1080/15732479.2015.1038723
Rashedi, R. , & Hegazy, T. . (2016). Holistic analysis of infrastructure deterioration and rehabilitation using system dynamics. Journal of Infrastructure Systems, 22. doi:10.1061/(ASCE)IS.1943-555X.0000273
Rashedi, R. , & Hegazy, T. . (2015). Capital renewal optimisation for large-scale infrastructure networks: genetic algorithms versus advanced mathematical tools. Structure and Infrastructure Engineering, 11, 253-262. doi:10.1080/15732479.2013.866968
M
Moselhi, O. , Hegazy, T. , & Fazio, P. . (1991). Practical cost estimation in a competitive environment. In Transactions of the American Association of Cost Engineers (p. H.5.1-H.5.9). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-0025846078&partnerID=40&md5=468b6a346233b1cb9623fbb570881cd5
Morcous, G. , & Hegazy, T. . (2003). Discussion of "Improving design coordination for building projects. I: Information model" by Tarek Hegazy, Essam Zaneldin, and Donald Grierson. Journal of Construction Engineering and Management, 129, 470-471. doi:10.1061/(ASCE)0733-9364(2003)129:4(470)
Minocha, V. K. , & Hegazy, T. . (2005). Discussion of "Reconstruction of the building infrastructure: Two performance prediction models" by Mohamed Attalla, Tarek Hegazy, and Ralph Haas. Journal of Infrastructure Systems, 11, 268-269. doi:10.1061/(ASCE)1076-0342(2005)11:4(268)
Menesi, W. , & Hegazy, T. . (2015). Multimode resource-constrained scheduling and leveling for practical-size projects. Journal of Management in Engineering, 31. doi:10.1061/(ASCE)ME.1943-5479.0000338
Menesi, W. , & Hegazy, T. . (2014). Discussion of "ant colony optimization for multimode resource-constrained project scheduling" by Hong Zhang. Journal of Management in Engineering, 30. doi:10.1061/(ASCE)ME.1943-5479.0000190
Menesi, W. , Golzarpoor, B. , & Hegazy, T. . (2013). Fast and near-optimum schedule optimization for large-scale projects. Journal of Construction Engineering and Management, 139, 1117-1124. doi:10.1061/(ASCE)CO.1943-7862.0000722

Pages