Publications
Building asset management with deficiency tracking and integrated life cycle optimisation. Structure and Infrastructure Engineering, 8, 729-738. doi:10.1080/15732471003777071
. (2012). Closure to critical path segments scheduling technique by Tarek Hegazy and Wail Menesi. Journal of Construction Engineering and Management, 138, 788-789. doi:10.1061/(ASCE)CO.1943-7862.0000541
. (2012). Email-based system for documenting construction as-built details. Automation in Construction, 24, 130-137. doi:10.1016/j.autcon.2012.02.014
. (2012). Enhancing the critical path segments scheduling technique for project control. Canadian Journal of Civil Engineering, 39, 968-977. doi:10.1139/L2012-024
. (2012). Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138, 688-696. doi:10.1061/(ASCE)CO.1943-7862.0000483
. (2012). MOST-FIT: Support techniques for inspection and life cycle optimization in building asset management. Computer-Aided Civil and Infrastructure Engineering, 27, 130-142. doi:10.1111/j.1467-8667.2011.00729.x
. (2012). Discussion of "time-profit trade-off analysis for construction projects" by Ahmed Senouci and Khaled El-Rayes. Journal of Construction Engineering and Management, 137, 96-97. doi:10.1061/(ASCE)CO.1943-7862.0000173
. (2011). Incorporating rework into construction schedule analysis. Automation in Construction, 20, 1051-1059. doi:10.1016/j.autcon.2011.04.006
. (2011). Multi-criteria decision analysis for infrastructure privatisation using conflict resolution. Structure and Infrastructure Engineering, 7, 661-671. doi:10.1080/15732470802677649
. (2011). Multiple optimization and segmentation technique (MOST) for large-scale bilevel life cycle optimization. Canadian Journal of Civil Engineering, 38, 263-271. doi:10.1139/L10-134
. (2011). Prospects of mind maps for better visualization of infrastructure literature. Journal of Professional Issues in Engineering Education and Practice, 137, 239-247. doi:10.1061/(ASCE)EI.1943-5541.0000072
. (2011). Attitude-based negotiation methodology for the management of construction disputes. Journal of Management in Engineering, 26, 114-122. doi:10.1061/(ASCE)ME.1943-5479.0000013
. (2010). Computerized DSS for construction conflict resolution under uncertainty. Journal of Construction Engineering and Management, 136, 1249-1257. doi:10.1061/(ASCE)CO.1943-7862.0000239
. (2010). Critical path segments scheduling technique. Journal of Construction Engineering and Management, 136, 1078-1085. doi:10.1061/(ASCE)CO.1943-7862.0000212
. (2010). Discussion of "permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling" by Jin-Lee Kim and Ralph D. Ellis Jr. Journal of Construction Engineering and Management, 136, 717-718. doi:10.1061/(ASCE)CO.1943-7862.0000075
. (2010). Roof deterioration and impact: A questionnaire survey. Journal of Retail and Leisure Property, 9, 337-348. doi:10.1057/rlp.2010.18
. (2010). Two condition indicators for building components based on reactive-maintenance data. Journal of Facilities Management, 8, 64-74. doi:10.1108/14725961011019085
. (2010). Integrated multiple-element bridge management system. Journal of Bridge Engineering, 14, 179-187. doi:10.1061/(ASCE)1084-0702(2009)14:3(179)
. (2009). Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134, 253-264. doi:10.1061/(ASCE)0733-9364(2008)134:4(253)
. (2008). System of multiple ANNs for online planning of numerous building improvements. Journal of Construction Engineering and Management, 134, 342-351. doi:10.1061/(ASCE)0733-9364(2008)134:5(342)
. (2008).