Publications
Delay analysis considering dynamic resource allocation and multiple baselines. In AACE International Transactions. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-57449103378&partnerID=40&md5=83d0f366ea519fceafe63c18618dc9f0
. (2008). Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134, 575-582. doi:10.1061/(ASCE)0733-9364(2008)134:8(575)
. (2008). Delay analysis under multiple baseline updates. In AACE International Transactions (p. CDR.19.1-CDR.19.8). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-55849142618&partnerID=40&md5=78274ab69eb3af8d106b6925d399fdfe
. (2007). Multiple criteria decision support for infrastructure privatization. In Congress on Computing in Civil Engineering, Proceedings (pp. 558-565). doi:10.1061/40937(261)66
. (2007). Negotiation characteristics in brownfield redevelopment projects. In Conference Proceedings - IEEE International Conference on Systems, Man and Cybernetics (pp. 1866-1871). doi:10.1109/ICSMC.2007.4414193
. (2007). Uncertainty analysis in construction conflict resolution using information-gap theory. In Conference Proceedings - IEEE International Conference on Systems, Man and Cybernetics (pp. 1842-1847). doi:10.1109/ICSMC.2007.4414041
. (2007). Computerized system for efficient delivery of infrastructure maintenance/repair programs. Journal of Construction Engineering and Management, 132, 26-34. doi:10.1061/(ASCE)0733-9364(2006)132:1(26)
. (2006). Better visualization for multiple-site infrastructure programs using GIS. Solid Mechanics and its Applications, 140, 793-800. doi:10.1007/1-4020-4891-2_67
. (2006). Comparison of two evolutionary algorithms for optimization of bridge deck repairs. Computer-Aided Civil and Infrastructure Engineering, 21, 561-572. doi:10.1111/j.1467-8667.2006.00458.x
. (2006). Conflict resolution in construction disputes using the graph model. Journal of Construction Engineering and Management, 132, 1043-1052. doi:10.1061/(ASCE)0733-9364(2006)132:10(1043)
. (2006). Simplified project management for construction practitioners. Cost Engineering (Morgantown, West Virginia), 48, 20-28. Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-33751371489&partnerID=40&md5=9925257869b4032983bfc945e5f91c3a
. (2006). Apportioning concurrent delays and accelerations using daily windows. In Construction Research Congress 2005: Broadening Perspectives - Proceedings of the Congress (pp. 787-796). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-27644552935&partnerID=40&md5=09f97f19d6b7ace6add644f5569fc80b
. (2005). Closure to “reconstruction of the building infrastructure: Two performance prediction models”. Journal of Infrastructure Systems, 11, 269-269. doi:10.1061/(ASCE)1076-0342(2005)11:4(269)
. (2005). Comparison among five evolutionary-based optimization algorithms. Advanced Engineering Informatics, 19, 43-53. doi:10.1016/j.aei.2005.01.004
. (2005). Daily windows delay analysis. Journal of Construction Engineering and Management, 131, 505-512. doi:10.1061/(ASCE)0733-9364(2005)131:5(505)
. (2005). Discussion of "Reconstruction of the building infrastructure: Two performance prediction models" by Mohamed Attalla, Tarek Hegazy, and Ralph Haas. Journal of Infrastructure Systems, 11, 268-269. doi:10.1061/(ASCE)1076-0342(2005)11:4(268)
. (2005). Evolutionary algorithms for optimizing bridge deck rehabilitation. In Proceedings of the 2005 ASCE International Conference on Computing in Civil Engineering (pp. 619-630). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-27144472763&partnerID=40&md5=4da109681d4762aebab3b3f52f26cd04
. (2005). Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131, 168-175. doi:10.1061/(ASCE)0733-9364(2005)131:2(168)
. (2005). Modified but-for method for delay analysis. Journal of Construction Engineering and Management, 131, 1142-1144. doi:10.1061/(ASCE)0733-9364(2005)131:10(1142)
. (2005). Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130, 160-167. doi:10.1061/(ASCE)0733-9364(2004)130:2(160)
. (2004).