Engineering 5 (E5)

Entrances

  • The main entrance facing Davis Centre (DC) is ramped and accesses the second floor.
  • Access to Engineering 3 (E3) via overpass on fifth floor.
  • Please Note: The door facing Phillip St./East Campus Hall (enter on the first floor) is closed off due to the construction of Engineering 7 (E7).

First floor

  • A washroom with an accessible stall is located on the Southeast side.
  • Elevators are located on the Southeast side.

Second floor

  • A washroom with an accessible stall is located on the Southeast side.
  • Elevators are located on the Southeast side.
  • The main entrance facing Davis Centre (DC) is ramped and accesses this floor.

Thrid floor

  • A washroom with an accessible stall is located on the Southeast side.
  • Elevators are located on the Southeast side.

Fourth floor

  • A washroom with an accessible stall is located on the Southeast side.
  • Elevators are located on the Southeast side.

Fifth floor

  • A washroom with an accessible stall is located on the Southeast side.
  • Elevators are located on the Southeast side.
  • An overpass to Engineering 3 (E3) is available on this floor.

Sixth floor

  • A washroom with an accessible stall is located on the Southeast side.
  • Elevators are located on the Southeast side.
  • Vending machines are located on this floor.

Comments

  • The building is adjacent to the University Plaza with several food options.
  • Accessible parking for persons with disabilities is available in most lots. For details, contact Parking Services.

Categories: 

Accessible entrances

Elevators

Food and drink

Parking

Washrooms

Location:

Enable JavaScript to view map.