Alberto Betancout-Torcat
The aim of my MASc thesis was to develop a new energy model that predicts the energy infrastructure required to maintain the oil production in the Oil Sands operations at minimum cost. The key novelty in my research is that the model searches simultaneously for the most suitable set of oil production schemes and the corresponding energy infrastructures that satisfy the total production demands under environmental constraints, i.e., CO2 emissions targets.