Citation:
Whiteley, L. , & Tighe, S. . (2005). Incorporating variability into life cycle cost analysis and pay factors for performance-based specifications. In Proceedings, Annual Conference - Canadian Society for Civil Engineering (Vol. 2005, pp. TR-121-1-TR-121-10). Retrieved from https://www.scopus.com/inward/record.uri?eid=2-s2.0-33748954401&partnerID=40&md5=9047d479a3081a079efc2e536ff503c5