Citation:
Bosche, F. , Guillemet, A. , Turkan, Y. , Haas, C. T. , & Haas, R. . (2014). Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system. Journal of Computing in Civil Engineering, 28 (4). Retrieved from https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CP.1943-5487.0000343