Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management. Construction Innovation.
. (2021). A computational methodology for generating modular design options for building extensions. Automation in Construction, 127, 103700.
. (2021). Topology Optimization of Architectural Panels to Minimize Waste during Fabrication: Algorithms for Panel Unfolding and NestingAuthorsChris Rausch, Benjamin Sanchez, Carl Haa. Journal of Construction Engineering and Management, 147(7), 05021006.
. (2021). Quantitative investigation on the accuracy and precision of Scan-to-BIM under different modelling scenarios. Automation in Construction, 126. Retrieved from https://doi.org/10.1016/j.autcon.2021.103686
. (2021). Deploying 3D scanning based geometric digital twins during fabrication and assembly in offsite manufacturing. International Journal of Construction Management, 1-14. Retrieved from https://doi.org/10.1080/15623599.2021.1896942
. (2021). Optimizing 3D Irregular Object Packing from 3D Scans Using Metaheuristics. Advanced Engineering Informatics, 47, 101234. Retrieved from https://doi.org/10.1016/j.aei.2020.101234
. (2021). Analysis of the Limits of Automated Rule-Based Ergonomic Assessment in Bricklaying. Journal of Construction Engineering and Management, 147(2), 04020163. Retrieved from https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0001978
. (2021). Automated shape and pose updating of building information model elements from 3D point clouds. Automation in Construction, 124, 103561. Retrieved from https://doi.org/10.1016/j.autcon.2021.103561
. (2021). Interface Health and Workload between Stakeholders in Complex Capital Projects: Assessment, Visualization, and Interpretation Using SNA. Journal of Management in Engineering, 37(3), 04021006. Retrieved from https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.0000891
. (2021). Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory. Journal of Construction Engineering and Management, 146(2). Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0001747
. (2020). Probabilistic risk management framework for tolerance-related issues in modularized projects: local and global perspectives. ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, 6(1). Retrieved from https://doi.org/10.1061/AJRUA6.0001036
. (2020). A selective disassembly multi-objective optimization approach for adaptive reuse of building components. Resources, Conservation and Recycling, 154. Retrieved from https://doi.org/10.1016/j.resconrec.2019.104605
. (2020). Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies. Construction Innovation, 20(3), 471-508. Retrieved from https://doi.org/10.1108/CI-11-2019-0133
. (2020). Geometric accuracy of digital twins for structural health monitoring. In Bridge Engineering. IntechOpen. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=8722062051834655463&btnI=1&hl=en 72444.pdf
. (2020). Potential economic and energy impacts of substituting adaptive reuse for new building construction: A case study of Ontario. Journal of Cleaner Production, 259. Retrieved from https://doi.org/10.1016/j.jclepro.2020.120939
. (2020). Benchmarking and improving dimensional quality on modular construction projects–A case study. International Journal of Industrialized Construction, 1(1), 2-21. Retrieved from https://doi.org/10.29173/ijic212 benchmarking_and_improving_dimensional_quality_on_modular_construction_projects-a_case_study.pdf
. (2020). Identifying enablers for coordination across construction supply chain processes: a systematic literature review. Engineering, Construction and Architectural Management. Retrieved from https://doi.org/10.1108/ECAM-05-2020-0299
. (2020). Analysis of relationships between body load and training, work methods, and work rate: Overcoming the novice mason’s risk hump. Journal of Construction Engineering and Management, 146(8). Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0001889
. (2020). Prioritizing Preproject Planning Activities Using Value of Information Analysis. Journal of Management in Engineering, 36(5). Retrieved from https://doi.org/10.1061/(ASCE)ME.1943-5479.0000822
. (2020). Development of a Decision Making Methodology to Optimize the Process of Scope Definition Improvement: A Building Adaptive Reuse Case Study. In Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts (pp. 330-338). American Society of Civil Engineers. Retrieved from https://doi.org/10.1061/9780784482889.035
. (2020).