Publications
A methodology to analyze the net environmental impacts and building’s cost performance of an adaptive reuse project: a case study of the Waterloo County Courthouse renovations. Environment Systems and Decisions, 39(4), 419-438. Retrieved from https://doi.org/10.1007/s10669-019-09734-2
. (2019). Impact of augmented reality and spatial cognition on assembly in construction. Automation in Construction, 108. Retrieved from https://doi.org/10.1016/j.autcon.2019.102935
. (2019). Jerk as an indicator of physical exertion and fatigue. Automation in Construction, 104, 120-128. Retrieved from https://doi.org/10.1016/j.autcon.2019.04.016
. (2019). Deconstruction programming for adaptive reuse of buildings. Automation in Construction, 107. Retrieved from https://doi.org/10.1016/j.autcon.2019.102921
. (2019). Derivation of Minimum Required Model for Augmented Reality Based Stepwise Construction Assembly Control. In Workshop of the European Group for Intelligent Computing in Engineering (Vol. 10863, pp. 336-358). Springer, Cham. Retrieved from https://doi.org/10.1007/978-3-319-91635-4_18
. (2018). Evaluating artificial intelligence tools for automated practice conformance checking. International Symposium on Automation and Robotics in Construction. Retrieved from https://doi.org/10.22260/isarc2018%2F0015
. (2018). Motion data based construction worker training support tool: Case study of masonry work. International Symposium on Automation and Robotics in Construction. Retrieved from https://doi.org/10.22260/isarc2018%2F0150
. (2018). PIECE 3D: Portable Interactive Education for Construction Engineering in 3D. International Symposium on Automation and Robotics in Construction. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=12043666691639473230&btnI=1&hl=en
. (2018). A conceptual framework for tracking design completeness of Track Line discipline in MRT projects. International Symposium on Automation and Robotics in Construction. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=15401547300572318404&btnI=1&hl=en
. (2018). Facilitating the Communication of Rework Information to Craft Workers Using an Augmented Reality Process. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 35. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=15915907439949132890&btnI=1&hl=en Facilitating-the-Communication-of-Rework-Information-to-Craft-Workers-Using-Augmented-Reality.pdf
. (2018). A Quantitative Comparison of Adaptive Reuse Strategies of Residential Towers in Northern Climates. EG-ICE. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=12295065544968536416&btnI=1&hl=en paper04.pdf
. (2018). A decision-making method for choosing concrete forming systems. International Journal of Construction Management, 18(1), 53-64. Retrieved from https://doi.org/10.1080/15623599.2016.1253243 A-decision-making-method-for-choosing-concrete-forming-systems.pdf
. (2018). Benchmark performance indicators for utility water and wastewater pipelines infrastructure. Journal of Water Resources Planning and Management, 144(3), 04018003. Retrieved from https://doi.org/10.1061/(ASCE)WR.1943-5452.0000890 Benchmark-Performance-Indicators-for-Utility-Water-and-Wastewater-Pipelines-Infrastructure.pdf
. (2018). Capital project planning for a circular economy. Construction Management and Economics, 36(6), 303-312. Retrieved from https://doi.org/10.1080/01446193.2018.1435895
. (2018). Analyzing Conflicts over Water Extraction from Great Lakes of North America through Game Theory Approaches. In Pipelines 2018: Utility Engineering, Surveying, and Multidisciplinary Topics (pp. 195-203). American Society of Civil Engineers. Retrieved from https://doi.org/10.1061/9780784481660.022
. (2018). Assessment of Jerk As a Method of Physical Fatigue Detection. ASME 2018 International Design Engineering Technical Conferences and Computers and Information in Engineering Conference. Retrieved from https://doi.org/10.1115/DETC2018-86289 Assessment-of-Jerk-As-a-Method-of-Physical-Fatigue-Detection.pdf
. (2018). Improving construction industry process interoperability with Industry Foundation Processes (IFP). Advanced Engineering Informatics, 38, 555-568. Retrieved from https://doi.org/10.1016/j.aei.2018.09.001
. (2018). How to improve interface management behaviors in EPC projects: Roles of formal practices and social norms. Journal of Management in Engineering, 34(6), 04018032. Retrieved from https://doi.org/10.1061/(ASCE)ME.1943-5479.0000639 How-to-Improve-Interface-Management-Behaviors-in-EPC-Projects-Roles-of-Formal-Practices-and-Social-Norms.pdf
. (2018). 6D DBSCAN-based segmentation of building point clouds for planar object classification. Automation in Construction, 88, 44-58. Retrieved from https://doi.org/10.1016/j.autcon.2017.12.029
. (2018). A novel selective disassembly sequence planning method for adaptive reuse of buildings. Journal of Cleaner Production , 183, 998-1010. Retrieved from https://doi.org/10.1016/j.jclepro.2018.02.201
. (2018).