Publications

Search
Author Title Type [ Year(Asc)]
2016
Rausch, C. , Zhang, L. , West, J. , & Haas, C. . (2016). Analyzing the Critical Sources of Dimensional Variability during the Lifecycle of a Steel Framed Modular Construction Project. Modular and Offsite Construction (MOC) Summit Proceedings. Retrieved from https://doi.org/10.29173/mocs32
Fiolet, J. - C. , Haas, C. , & Hipel, K. . (2016). Risk-chasing behaviour in on-site construction decisions. Construction Management and Economics, 34(12), 845-858. Retrieved from https://doi.org/10.1080/01446193.2016.1207790
Shokri, S. , Haas, C. T. , Lee, R. C. G. , & .H., S. . (2016). Interface-management process for managing risks in complex capital projects. Journal of Construction Engineering and Management, 142 (2). Retrieved from https://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943-7862.0000990
Nahangi, M. , & Haas, C. T. . (2016). Skeleton-based discrepancy feedback for automated realignment of industrial assemblies. Automation in Construction, volume: 61, p: 147-161. Retrieved from http://www.sciencedirect.com/science/article/pii/S0926580515002198
Czerniawski, T. , Nahangi, M. , Haas, C. , & Walbridge, S. . (2016). Pipe spool recognition in cluttered point clouds using a curvature-based shape descriptor, Automation in Construction. Automation in Construction, volume: 71, p: 346-358. Retrieved from http://www.sciencedirect.com/science/article/pii/S0926580516301650
2015
Bosche, F. , Ahmed, M. , Turkan, Y. , Haas, C. T. , & Haas, R. . (2015). The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components. Automation in Construction, 49, 201-213. Retrieved from https://doi.org/10.1016/j.autcon.2014.05.014
Caldas, C. H. , Kim, J. - Y. , Haas, C. T. , Goodrum, P. M. , & Zhang, D. . (2015). Method to assess the level of implementation of productivity practices on industrial projects, 141(1). Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000919
Haas, C. , Bosche, F. , & Kim, C. . (2015). ISARC 2013. In Automation in Construction (Vol. 49, pp. 175-175). Retrieved from https://doi.org/10.1016/j.autcon.2014.11.002
Nahangi, M. , Czerniawski, T. , Yeung, J. , Haas, C. T. , Walbridge, S. , & West, J. S. . (2015). An image-based frameworks for automated discrepancy quantification and realignment of industrial assemblies. In 5th Int. Construction Specialty Confence (pp. 0471-0479). Retrieved from https://pdfs.semanticscholar.org/d9ed/4494715eeecc79dcd512acf17cfe15d80853.pdf
Rehan, R. , Unger, A. , Knight, M. A. , & Haas, C. . (2015). Strategic water utility management and financial planning using a new system dynamics tool. Journal‐American Water Works Association, 107(1), E22-E36. Retrieved from https://doi.org/10.5942/jawwa.2015.107.0006
Ganjidoost, A. , Haas, C. T. , Knight, M. A. , & Unger, A. J. A. . (2015). INTEGRATED ASSET MANAGEMENT OF WATER AND WASTEWATER INFRASTRUCTURE SYSTEMS—BORROWING FROM INDUSTRY FOUNDATION CLASSES. International Construction Specialty Conference of the Canadian Society for Civil Engineering. Retrieved from https://www.researchgate.net/profile/Amin-Ganjidoost/publication/319490999_INTEGRATED_ASSET_MANAGEMENT_OF_WATER_AND_WASTEWATER_INFRASTRUCTURE_SYSTEMS-BORROWING_FROM_INDUSTRY_FOUNDATION_CLASSES/links/59aed670458515150e4738bc/INTEGRATED-ASSET-MANAGEMENT-OF-
Nahangi, M. , Chaudhary, L. , Yeung, J. , Haas, C. T. , & Walbridge, S. . (2015). Skeleton-based registration of 3D laser scans for automated quality assurance of industrial facilities. In Computing in Civil Engineering (pp. 33-40). Retrieved from https://doi.org/10.1061/9780784479247.005
Nahangi, M. , Yeung, J. , Haas, C. , Walbridge, S. , & West, J. . (2015). Robotic Kinematics Analogy for Realignment of Defective Construction Assemblies. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 32(1). Retrieved from https://www.semanticscholar.org/paper/Robotic-Kinematics-Analogy-for-Realignment-of-Nahangi-Yeung/3ae1231f4599e2465e6646b28ef6d9594fdcfee6?p2df
Fiolet, J. - C. , & Haas, C. T. . (2015). Application of prospect theory to management decisions under risk on construction projects. Retrieved from https://pdfs.semanticscholar.org/c7ab/76f6cf33de0a525cd76601c4cea07a41a386.pdf
Rankin, J. , Froese, T. M. , Issa, M. , Quaigrain, R. , Haas, C. T. , & Nasir, H. . (2015). Assessing the management practices for small to medium sized Canadian general contractor organizations. Retrieved from https://doi.org/10.14288/1.0076493
Ahn, S. , Shokri, S. , Lee, S. , Haas, C. , & Haas, R. . (2015). Motivation For Interface Management In Construction: A Project Complexity Perspective. 5th International/11th Construction Specialty Conference. Retrieved from https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=15930760848633137999
Safa, M. , MacGillivray, S. , Davidson, M. , Kaczmarczy, K. , Haas, C. , & Gibson, E. . (2015). Identifying influential factors for capital construction project planning strategies. Canadian Society for Civil Engineering Construction Specialty Conference. Retrieved from https://www.semanticscholar.org/paper/Identifying-influential-factors-for-capital-project-Safa-MacGillivray/33bc912b3f1105dde86612480ed48e79624c0728?p2df
Brilakis, I. , & Haas, C. . (2015). Infrastructure computer vision. Advanced Engineering Informatics, 2(29), 147-148. Retrieved from https://www.infona.pl/resource/bwmeta1.element.elsevier-103f8c69-a679-3482-9824-180c83b55b8c
Pătrăucean, V. , Armeni, I. , Nahangi, M. , Yeung, J. , Brilakis, I. , & Haas, C. . (2015). State of research in automatic as-built modelling. Advanced Engineering Informatics, 29(2), 162-171. Retrieved from https://doi.org/10.1016/j.aei.2015.01.001
Shadpour, A. , Unger, A. J. A. , Knight, M. A. , & Haas, C. T. . (2015). Numerical DAE approach for solving a system dynamics problem. Journal of Computing in Civil Engineering, 29(3). Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000349

Pages