Citation:
Shan, Y. , Kim, J. Yeol, Goodrum, P. M. , Caldas, C. H. , & Haas, C. . (2014). Impact of steel quick connection system on steel erection labor productivity: case studies and simulation based analyses. Canadian Journal of Civil Engineering, 41(12). Retrieved from https://doi.org/10.1139/cjce-2014-0079