Citation:
Bosche, F. , Guillemet, A. , Turkan, Y. , Haas, C. T. , & Haas, R. . (2014). Tracking the built status of MEP works: Assessing the value of a Scan-vs-BIM system. Journal of computing in civil engineering, 28(4). Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000343