Publications
Interface Health and Workload between Stakeholders in Complex Capital Projects: Assessment, Visualization, and Interpretation Using SNA. Journal of Management in Engineering, 37(3), 04021006. Retrieved from https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.0000891
. (2021). Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory. Journal of Construction Engineering and Management, 146(2). Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0001747
. (2020). Probabilistic risk management framework for tolerance-related issues in modularized projects: local and global perspectives. ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, 6(1). Retrieved from https://doi.org/10.1061/AJRUA6.0001036
. (2020). A selective disassembly multi-objective optimization approach for adaptive reuse of building components. Resources, Conservation and Recycling, 154. Retrieved from https://doi.org/10.1016/j.resconrec.2019.104605
. (2020). Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies. Construction Innovation, 20(3), 471-508. Retrieved from https://doi.org/10.1108/CI-11-2019-0133
. (2020). Potential economic and energy impacts of substituting adaptive reuse for new building construction: A case study of Ontario. Journal of Cleaner Production, 259. Retrieved from https://doi.org/10.1016/j.jclepro.2020.120939
. (2020). Benchmarking and improving dimensional quality on modular construction projects–A case study. International Journal of Industrialized Construction, 1(1), 2-21. Retrieved from https://doi.org/10.29173/ijic212 benchmarking_and_improving_dimensional_quality_on_modular_construction_projects-a_case_study.pdf
. (2020). Identifying enablers for coordination across construction supply chain processes: a systematic literature review. Engineering, Construction and Architectural Management. Retrieved from https://doi.org/10.1108/ECAM-05-2020-0299
. (2020). Analysis of relationships between body load and training, work methods, and work rate: Overcoming the novice mason’s risk hump. Journal of Construction Engineering and Management, 146(8). Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0001889
. (2020). Prioritizing Preproject Planning Activities Using Value of Information Analysis. Journal of Management in Engineering, 36(5). Retrieved from https://doi.org/10.1061/(ASCE)ME.1943-5479.0000822
. (2020). Health and productivity impact of semi-automated work systems in construction. Automation in Construction, 120, 103396. Retrieved from https://doi.org/10.1016/j.autcon.2020.103396
. (2020). A definition framework for building adaptation projects. Sustainable Cities and Society, 63, 102345. Retrieved from https://doi.org/10.1016/j.scs.2020.102345
. (2020). Pipe radius estimation using Kinect range cameras. Automation in construction, 99, 197-205. Retrieved from https://doi.org/10.1016/j.autcon.2018.12.015
. (2019). A comparative study of in-field motion capture approaches for body kinematics measurement in construction. Robotica, 37(5), 928-946. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=1810157740001472542&btnI=1&hl=en
. (2019). Usage of interface management system in adaptive reuse of buildings. Buildings, 9(5), 105. Retrieved from https://doi.org/10.3390/buildings9050105 buildings-09-00105.pdf
. (2019). Monte Carlo simulation for tolerance analysis in prefabrication and offsite construction. Automation in Construction, 103, 300-314. Retrieved from https://doi.org/10.1016/j.autcon.2019.03.026
. (2019). Integrated risk management framework for tolerance-based mitigation strategy decision support in modular construction projects. Journal of Management in Engineering, 35(4). Retrieved from https://doi.org/10.1061/(ASCE)ME.1943-5479.0000698
. (2019). A methodology to analyze the net environmental impacts and building’s cost performance of an adaptive reuse project: a case study of the Waterloo County Courthouse renovations. Environment Systems and Decisions, 39(4), 419-438. Retrieved from https://doi.org/10.1007/s10669-019-09734-2
. (2019). Impact of augmented reality and spatial cognition on assembly in construction. Automation in Construction, 108. Retrieved from https://doi.org/10.1016/j.autcon.2019.102935
. (2019). Jerk as an indicator of physical exertion and fatigue. Automation in Construction, 104, 120-128. Retrieved from https://doi.org/10.1016/j.autcon.2019.04.016
. (2019).