Publications

Search
[ Author(Desc)] Title Type Year
N
Nahangi, M. , Safa, M. , Shahi, A. , & Haas, C. T. . (2014). Automated registration of 3D point clouds with 3D CAD models for remote assessment of staged fabrication. In Construction Research Congress 2014: Construction in a Global Network (pp. 1004-1013). Retrieved from https://doi.org/10.1061/9780784413517.103
Nahangi, M. , Yeung, J. , Amaral, J. , Freitas, F. N. , Walbridge, S. , & Haas, C. T. . (2014). Automated Deviation Analysis for As-Built Status Assessment of Steel Assemblies and Pipe Spools. In Computing in Civil and Building Engineering (pp. 2063-2070). Retrieved from https://doi.org/10.1061/9780784413616.256
Nahangi, M. , & Haas, C. T. . (2014). Automated 3D compliance checking in pipe spool fabrication. Advanced Engineering Informatics, 28(4), 360-369. Retrieved from https://doi.org/10.1016/j.aei.2014.04.001
Nahangi, M. , & Haas, C. . (2014). Automated Form Checking for Pipe Spool Fabrication. Advanced Engineering Informatics, in press.
Nasir, H. , Haas, C. T. , Caldas, C. H. , & Goodrum, P. M. . (2016). An integrated productivity-practices implementation index for planning the execution of infrastructure projects. Journal of Infrastructure Systems, 22(2). Retrieved from https://doi.org/10.1061/(ASCE)IS.1943-555X.0000275
Nasir, H. , Ahmed, H. , Haas, C. , & Goodrum, P. M. . (2014). An analysis of construction productivity differences between Canada and the United States. Construction Management and Economics, 32(6), 595-607. Retrieved from https://doi.org/10.1080/01446193.2013.848995
Nasir, H. , Haas, C. , Shahtaheri, M. , Caldas, C. , & Goodrum, P. . (2013). Labour productivity improvement through the use of best practices for infrastructure construction projects. Proc., 4th Construction Specialty Conf., Canadian Society for Civil Engineering. Retrieved from https://www.researchgate.net/profile/Hassan-Nasir-4/publication/289593527_Labour_productivity_improvement_through_the_use_of_best_practices_for_infrastructure_construction_projects/links/5caef0eb4585156cd78f6fdb/Labour-productivity-improvement-through-the
Nasir, H. , Haas, C. T. , Rankin, J. H. , Fayek, A. Robinson, Forgues, D. , & Ruwanpura, J. . (2012). Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement. Canadian Journal of Civil Engineering, 39(9), 957-967. Retrieved from https://doi.org/10.1139/l2012-030
Nasir, H. , Haas, C. , Forgues, D. , Fayek, A. , Ruwanpura, J. , & Rankin, J. . (2012). Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement. Canadian Journal of Civil Engineering 39 (9), pp. 957-967.
Nasir, H. , Haas, C. , Fayek, A. R. , Forgues, D. , Rankin, J. , & Ruwanpura, J. . (2011). Development and implementation of a construction performance and productivity benchmarking program, 3, 1896-1905. Retrieved from https://espace2.etsmtl.ca/id/eprint/4258/
Nasir, H. , Haas, C. T. , Young, D. A. , Razavi, S. Nawabzadi, Caldas, C. , & Goodrum, P. . (2010). An implementation model for automated construction materials tracking and locating. Canadian Journal of Civil Engineering, 37(4), 588-599. Retrieved from https://doi.org/10.1139/L09-178
Nasir, H. , Haas, C. T. , Young, D. A. , Razavi, S. Nawabzadi, Caldas, C. , & Goodrum, P. . (2010). An implementation model for automated construction materials tracking and locating (vol 37, pg 588, 2010). CANADIAN JOURNAL OF CIVIL ENGINEERING, 37(6), 929-929. Retrieved from https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=9234848135491647709
P
Pătrăucean, V. , Armeni, I. , Nahangi, M. , Yeung, J. , Brilakis, I. , & Haas, C. . (2015). State of research in automatic as-built modelling. Advanced Engineering Informatics, 29(2), 162-171. Retrieved from https://doi.org/10.1016/j.aei.2015.01.001
Payganeh, S. , Knight, M. A. , & Haas, C. T. . (2018). Analyzing Conflicts over Water Extraction from Great Lakes of North America through Game Theory Approaches. In Pipelines 2018: Utility Engineering, Surveying, and Multidisciplinary Topics (pp. 195-203). American Society of Civil Engineers. Retrieved from https://doi.org/10.1061/9780784481660.022
Petreucean, V. , Armeni, I. , Nahangi, M. , Yeung, J. , Brilakis, I. , & Haas, C. . (2015). State of research in automatic as-built modelling. Advanced Engineering Informatics, 29 (2), pp. 162-171. Retrieved from https://www.sciencedirect.com/science/article/pii/S1474034615000026
Pradhan, A. , Akinci, B. , & Haas, C. T. . (2011). Formalisms for query capture and data source identification to support data fusion for construction productivity monitoring. Automation in Construction, 20(4), 389-398. Retrieved from https://doi.org/10.1016/j.autcon.2010.11.009
R
Rankin, J. , Froese, T. M. , Issa, M. , Quaigrain, R. , Haas, C. T. , & Nasir, H. . (2015). Assessing the management practices for small to medium sized Canadian general contractor organizations. Retrieved from https://doi.org/10.14288/1.0076493
Rankin, J. , Fayek, A. R. , Meade, G. , Haas, C. , & Manseau, A. . (2008). Initial metrics and pilot program results for measuring the performance of the Canadian construction industry. Canadian Journal of Civil Engineering, 35 (9), pp. 894-907.
Rausch, C. , Sanchez, B. , & Haas, C. . (2021). Topology Optimization of Architectural Panels to Minimize Waste during Fabrication: Algorithms for Panel Unfolding and NestingAuthorsChris Rausch, Benjamin Sanchez, Carl Haa. Journal of Construction Engineering and Management, 147(7), 05021006.
Rausch, C. , Lu, R. , Talebi, S. , & Haas, C. . (2021). Deploying 3D scanning based geometric digital twins during fabrication and assembly in offsite manufacturing. International Journal of Construction Management, 1-14. Retrieved from https://doi.org/10.1080/15623599.2021.1896942

Pages