Access control refresh project status

About this work

The University is upgrading the prox-fob based Hirsch-Identiv access control system and HID readers to a modern WatCard-based ICT access control system. All existing Hirsch-identiv access control units and HID readers will be replaced campus wide.

During this upgrade process, user requested access control expansion within buildings will be paused.

Project status

Current buildings: Arts

Next buildings: Engineering

Legend

  • Preparing cutover: Teams are working on installing the new system and preparing the doors for cutover
  • Ready for cutover: New hardware is in telecom rooms, a cutover date needs to be scheduled to swap readers at the doors
  • Complete: The building uses the new access control system
     

Building

Refresh status

AL

ready for cutover

ARCH

complete

AVR

B1

BMH

Brightstarts

C2

CAT

CIF

complete

COM

CPH

DC

DMS

complete

DPL

DWE

E2

E3

E5

E7

EC1

EC2

complete

EC3

EC4

EC5

ready for cutover

ECH

ready for cutover

EIT

ERC

ESC

preparing cutover

EV1

EV3

GSC

HH

preparing cutover

HS

IA

complete

IHB

M3

MHR

NH

complete

OPT

PAC/SLC

complete

PAS

preparing cutover

PHR

PHY

QNC

RAC1

RAC2

RCH

STC

TJB

ready for cutover


 

See the Campus Map for full building name and location.