About this work
The University is upgrading the prox-fob based Hirsch-Identiv access control system and HID readers to a modern WatCard-based ICT access control system. All existing Hirsch-identiv access control units and HID readers will be replaced campus wide.
During this upgrade process, user requested access control expansion within buildings will be paused.
Project status
Current buildings: Engineering
Next buildings: Science
Legend
- Preparing cutover: Teams are working on installing the new system and preparing the doors for cutover
- Ready for cutover: New hardware is in telecom rooms, a cutover date needs to be scheduled to swap readers at the doors
- Complete: The building uses the new access control system
|
Building |
Refresh status |
|---|---|
|
AL |
complete |
|
ARCH |
complete |
|
AVR |
complete |
|
B1 |
|
|
BMH |
|
|
Brightstarts |
|
|
C2 |
|
|
CAT |
complete |
|
CIF |
complete |
|
COM |
|
|
CPH |
complete |
|
DC |
|
|
DMS |
complete |
|
DPL |
|
|
DWE |
complete |
|
E2 |
ready for cutover |
|
E3 |
ready for cutover |
|
E5 |
preparing cutover |
| E6 | preparing cutover |
|
E7 |
preparing cutover |
|
EC1 |
|
|
EC2 |
complete |
|
EC3 |
|
|
EC4 |
complete |
|
EC5 |
complete |
|
ECH |
complete |
|
EIT |
|
|
ERC |
complete |
|
ESC |
complete |
|
EV1 |
|
|
EV3 |
|
|
GSC |
|
|
HH |
complete |
|
HS |
|
|
IA |
complete |
|
IHB |
|
|
M3 |
|
| MC | |
|
MHR |
|
|
NH |
complete |
|
OPT |
|
|
PAC/SLC |
complete |
|
PAS |
complete** |
|
PHR |
|
|
PHY |
|
|
QNC |
|
|
RAC1 |
|
|
RAC2 |
|
|
RCH |
complete |
|
STC |
|
|
TJB |
complete |
** Except area under construction
See the Campus Map for full building name and location.