Transferring studio space in EC5 from IST-ITMS to Engineering

Wednesday, November 9, 2022

What is happening? In consultation with the Faculty of Engineering and the Office of the Provost, space currently used by Information Systems & Technology’s Instructional Technologies and Media Services (IST-ITMS) team to provide their Studio services will be transferred to Engineering as there is a need to use the space – the anechoic chambers – for its designed purpose. 

When is this happening? The transition will occur by January 31, 2023. 

How will this change impact Studio services? Until a permanent solution is confirmed (2023), the followingStudio services will be available in the Mathematics and Computer (MC) building:

  • A self-service lightboard studio and an ITMS-staff editing station.
    • Green, white, and/or black screens will not be available. If required, please schedule use prior to January 2023. 
  • A sound booth with podcast space.
  • On-location bookings will continue to be available.

Information on how these temporary spaces can be booked/accessed, including specific location details, will be shared closer to the January 31, 2023, transition date. 

Communications regarding the future, permanent location of the ITMS Studio will also be shared once confirmed.   

 Questions or concerns? Please submit to Marcel David, mdavid@uwaterloo.ca