Publications
Integration of Diverse Technologies for Pavement Sensing. The National Research Council's Transportation Research Record, No. 1311, pp. 92-102.
. (1991). Computer Aided Planning for Heavy Lifts. ASCE Journal of Construction Engineering and Management, 119(3), pp. 498-515.
. (1993). Multiple Heavy Lifts Optimization. ASCE Journal of Construction Engineering and Management, Vol. 122, No. 4, pp. 354-362.
. (1996). Multiskilled Labor Utilization Strategies in Construction. ASCE Journal of Construction Engineering and Management, Vol. 124, No. 6, pp. 480-489.
. (1998). U.S. Construction Labor Productivity Trends from 1970 - 1998. ASCE Journal of Construction Engineering and Management, Vol. 126, No. 2, pp. 97-104.
. (2000). Partial Factor Productivity and Equipment Technology Change at the Activity Level in the U.S. Construction Industry. ASCE Journal of Construction Engineering and Management, Vol. 128, no.6, pp 463-472.
. (2002). Assignment and Allocation Optimization of a Partially Multiskilled Workforce. ASCE Journal of Construction Engineering and Management, Vol. 128, No. 2, pp. 103-109.
. (2002). Rapid Geometric Modeling for Unstructured Construction Workspaces. Computer-Aided Civil and Infrastructure Engineering, pp. 242-253, no. 18.
. (2003). Fitting Range Data to Primitives for Rapid Local 3D Modeling Using Sparse Range Point Clouds. Automation in Construction 13, pp. 67-81.
. (2004). Automated Quality Assessment of Stone Aggregates Based on Laser Imaging and a Neural Network. ASCE Journal of Computing in Civil Engineering, vol. 18, issue 1, pp. 58-64.
. (2004). Rapid, On-Site Spatial Information Acquisition and its Use for Infrastructure Operation and Maintenance. Automation in Construction, Vol 14/5, pp.666-684.
. (2005). Considering Prework on Industrial Projects. ASCE Journal of Construction Engineering and Management, Vol. 131, no. 6, pp. 723-733.
. (2005). Locating Sensor Nodes on Construction Projects. Autonomous Robots, 10.1007/s10514-006-9720-1.
. (2006). Examining Business Impact of Owner Commitment to Sustainability. ASCE J. of Construction Engineering and Management Volume 132, Issue 4, pp. 384-392.
. (2006). Human-Assisted Obstacle Avoidance System Using 3D Workspace Modeling for Construction Equipment Operation. ASCE J. Comp. in Civ. Engrg., Volume 20, Issue 3, pp. 177-186.
. (2006). Automating The Task of Tracking the Delivery and Receipt of Fabricated Pipe Spools in Industrial Projects. Automation in Construction, Vol. 15/2, pp 166-177.
. (2006). Graphical modeling and simulation for design and control of a tele-operated clinker clearing robot. Automation in construction, 16(1), 96-106. Retrieved from https://doi.org/10.1016/j.autcon.2005.12.002
. (2007). Using Road Weather Information Systems (RWIS) to control load restrictions on gravel and surface-treated highways. Retrieved from https://trid.trb.org/view/890581
. (2007). Towards automated retrieval of 3D designed data in 3D sensed data. In Computing in Civil Engineering (pp. 648-656). Retrieved from https://doi.org/10.1061/40937(261)77
. (2007). Application du TBM pour la localisation de noeuds de communication à partir de mesures de proximité. Traitement du Signal. Retrieved from http://hdl.handle.net/2042/8917
. (2007).