Publications
Application of System Dynamics for developing financially self-sustaining management policies for water and wastewater systems. Water Research 45 (16), pp. 4737-4750.
. (2011). Analysis of the benefits and costs of construction craft training in the United States based on expert perceptions and industry data. Construction Management and Economics, 28 (12), pp. 1269-1285. Retrieved from http://www.tandfonline.com/doi/abs/10.1080/01446193.2010.524238
. (2010). Multisensor data fusion for on-site materials tracking in construction. Automation in Construction, 19 (8), pp. 1037-1046. Retrieved from https://www.sciencedirect.com/science/article/pii/S0926580510001159
. (2010). Multi-sensor Data Fusion for On-Site Materials Tracking in Construction. Automation in Construction 19 (8), pp. 1037-1046.
. (2010). Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management, 135 (3), pp. 187-198. Retrieved from https://ascelibrary.org/doi/abs/10.1061/%28ASCE%290733-9364%282009%29135%3A3%28187%29
. (2009). The Relationship between Automation and Integration of Construction Information Systems and Labor Productivity. ASCE JCEM, Vol. 135, no. 8.
. (2009). Measuring the Impacts of Rework on Construction Cost Performance. ASCE Journal of Construction Engineering and Management, Vol. 135, No. 3, pp. 187-198.
. (2009). Initial metrics and pilot program results for measuring the performance of the Canadian construction industry. Canadian Journal of Civil Engineering, 35 (9), pp. 894-907.
. (2008). Automated Retrieval of 3D CAD Model Objects in Construction 3D Images. Journal of Automation in Construction, Elsevier, New-York, USA, Volume 17, Issue 4, pp 499-512.
. (2008). Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources. Journal of Construction Engineering and Management 133 (11), pp. 880-888.
. (2007). Locating Sensor Nodes on Construction Projects. Autonomous Robots, 10.1007/s10514-006-9720-1.
. (2006). Examining Business Impact of Owner Commitment to Sustainability. ASCE J. of Construction Engineering and Management Volume 132, Issue 4, pp. 384-392.
. (2006). Human-Assisted Obstacle Avoidance System Using 3D Workspace Modeling for Construction Equipment Operation. ASCE J. Comp. in Civ. Engrg., Volume 20, Issue 3, pp. 177-186.
. (2006). Automating The Task of Tracking the Delivery and Receipt of Fabricated Pipe Spools in Industrial Projects. Automation in Construction, Vol. 15/2, pp 166-177.
. (2006). Rapid, On-Site Spatial Information Acquisition and its Use for Infrastructure Operation and Maintenance. Automation in Construction, Vol 14/5, pp.666-684.
. (2005). Considering Prework on Industrial Projects. ASCE Journal of Construction Engineering and Management, Vol. 131, no. 6, pp. 723-733.
. (2005). Fitting Range Data to Primitives for Rapid Local 3D Modeling Using Sparse Range Point Clouds. Automation in Construction 13, pp. 67-81.
. (2004). Automated Quality Assessment of Stone Aggregates Based on Laser Imaging and a Neural Network. ASCE Journal of Computing in Civil Engineering, vol. 18, issue 1, pp. 58-64.
. (2004). Rapid Geometric Modeling for Unstructured Construction Workspaces. Computer-Aided Civil and Infrastructure Engineering, pp. 242-253, no. 18.
. (2003). Partial Factor Productivity and Equipment Technology Change at the Activity Level in the U.S. Construction Industry. ASCE Journal of Construction Engineering and Management, Vol. 128, no.6, pp 463-472.
. (2002).