Publications
Automated Retrieval of 3D CAD Model Objects in Construction 3D Images. Journal of Automation in Construction, Elsevier, New-York, USA, Volume 17, Issue 4, pp 499-512.
. (2008). A data fusion model for location estimation in construction.‖. Proc, the International Symposium for Automation and Robotics in Construction (ISARC). Retrieved from https://www.researchgate.net/profile/Seyed-Naser-Razavi/publication/239594768_A_Data_Fusion_Model_for_Location_Estimation_in_Construction/links/5a15ca6c4585153b546cb278/A-Data-Fusion-Model-for-Location-Estimation-in-Construction.pdf
. (2009). Improvements in Piezoelectric Sensors and Weigh-in-Motion Data Collection Technology. 2009 Annual Conference and Exhibition of the Transportation Association of Canada-Transportation in a Climate of Change. Retrieved from https://trid.trb.org/view/911640
. (2009). Impact of fast automated tracking of construction components on labor productivity. Procs 26th International Symposium on Automation and Robotics in Construction (ISARC). Retrieved from https://www.semanticscholar.org/paper/Impact-of-fast-automated-tracking-of-construction-Grau-Caldas/b47300909c7f7c2b34c66630a5acdea0cb1c3105?p2df
. (2009). Measuring the impact of rework on construction cost performance. Journal of construction engineering and management, 135(3), 187-198. Retrieved from https://doi.org/10.1061/(ASCE)0733-9364(2009)135:3(187)
. (2009). Understanding and interpreting baseline perceptions of sustainability in construction among civil engineers in the United States. Journal of management in engineering, 25(3), 143-154. Retrieved from https://doi.org/10.1061/(ASCE)0742-597X(2009)25:3(143)
. (2009). Real world implementation of belief function theory to detect dislocation of materials in construction. 2009 12th International Conference on Information Fusion. Retrieved from https://ieeexplore.ieee.org/abstract/document/5203803
. (2009). Relationship between automation and integration of construction information systems and labor productivity. Journal of Construction Engineering and Management, 135(8), 746-753. Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000024
. (2009). Leveraging Materials Tracking Technologies to Improve Industrial Project Performance. Managing IT in Construction/Managing Construction for Tomorrow, 181. Retrieved from https://books.google.ca/books?hl=en&lr=&id=B0NZDwAAQBAJ&oi=fnd&pg=PA181&ots=dCFhSJ5ZO5&sig=P1q3NKkiXOp2dEPfM8noLUcRz9k#v=onepage&q&f=false
. (2009). Analysis of observed skill affinity patterns and motivation for multiskilling among craft workers in the US industrial construction sector. Journal of construction engineering and management, 135(10), 999-1008. Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000072
. (2009). Improvements in piezoelectric sensors and WIM data collection technology. Proceedings of the 2009 Annual Conference of the Transportation Association of Canada. Retrieved from http://conf.tac-atc.ca/english/resourcecentre/readingroom/conference/conf2009/pdf/Jiang.pdf
. (2009). Spray nozzle and method for dusting freshly printed products. US Patent No. 7607391. Retrieved from https://patents.google.com/patent/US7607391B2/en
. (2009). Assessing the impact of materials tracking technologies on construction craft productivity. Automation in construction, 18(7), 903-911. Retrieved from https://doi.org/10.1016/j.autcon.2009.04.001
. (2009). Automated recognition of 3D CAD objects in site laser scans for project 3D status visualization and performance control. Journal of Computing in Civil Engineering, 23(6), 311-318. Retrieved from https://doi.org/10.1061/(ASCE)0887-3801(2009)23:6(311)
. (2009). Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management, 135 (3), pp. 187-198. Retrieved from https://ascelibrary.org/doi/abs/10.1061/%28ASCE%290733-9364%282009%29135%3A3%28187%29
. (2009). The Relationship between Automation and Integration of Construction Information Systems and Labor Productivity. ASCE JCEM, Vol. 135, no. 8.
. (2009). Measuring the Impacts of Rework on Construction Cost Performance. ASCE Journal of Construction Engineering and Management, Vol. 135, No. 3, pp. 187-198.
. (2009). Potential of low-cost, close-range photogrammetry toward unified automatic pavement distress surveying. Transportation Research Board 89th Annual MeetingTransportation Research Board, (10-0825). Retrieved from https://trid.trb.org/view/909660
. (2010). Automated materials tracking and locating: impact modeling and estimation. In Construction Research Congress 2010: Innovation for Reshaping Construction Practice (pp. 41-50). Retrieved from https://doi.org/10.1061/41109(373)5
. (2010). Towards automated progress tracking of erection of construction of concrete structures. Proceedings, Sixth International Conference on Innovation in Architecture, Engineering and Construction. Retrieved from http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.716.4785
. (2010).