Publications

Search
Author Title Type [ Year(Asc)]
2011
Nasir, H. , Haas, C. , Fayek, A. R. , Forgues, D. , Rankin, J. , & Ruwanpura, J. . (2011). Development and implementation of a construction performance and productivity benchmarking program, 3, 1896-1905. Retrieved from https://espace2.etsmtl.ca/id/eprint/4258/
Ahmed, M. , Haas, C. , Shahi, A. , Aryan, A. , West, J. , & Haas, R. . (2011). Rapid tracking of pipe-works progress using digital photogrammetry. Proceedings of the 9th Construction Specialty Conference. Retrieved from https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=6925103191493667810
Shan, Y. , Goodrum, P. M. , Zhai, D. , Haas, C. , & Caldas, C. H. . (2011). The impact of management practices on mechanical construction productivity. Construction Management and Economics, 29(3), 305-316. Retrieved from https://doi.org/10.1080/01446193.2010.538070
Blaser, P. Theobald, Haas, C. , & Stelter, M. . (2011). Method of controlling a powder sprayer and printing press having a powder sprayer. US Patent No. 7942096. Retrieved from https://patents.google.com/patent/US7942096B2/en
Ahmed, M. , Guillemet, A. , Shahi, A. , Haas, C. T. , West, J. S. , & Haas, R. C. G. . (2011). Comparison of point-cloud acquisition from laser-scanning and photogrammetry based on field experimentation. CSCE 3rd International/9th Construction Specialty Conference. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=1438405169575536954&btnI=1&hl=en
Alwasel, A. , Elrayes, K. , Abdel-Rahman, E. M. , & Haas, C. . (2011). Sensing construction work-related musculoskeletal disorders (WMSDs). ISARC Proc. Retrieved from https://www.researchgate.net/profile/Abdullatif-Alwasel/publication/234109255_Sensing_Construction_Work-Related_Musculoskeletal_Disorders_WMSDs/links/0deec5239c58dc410b000000/Sensing-Construction-Work-Related-Musculoskeletal-Disorders-WMSDs.pdf
Pradhan, A. , Akinci, B. , & Haas, C. T. . (2011). Formalisms for query capture and data source identification to support data fusion for construction productivity monitoring. Automation in Construction, 20(4), 389-398. Retrieved from https://doi.org/10.1016/j.autcon.2010.11.009
Goodrum, P. M. , Haas, C. T. , Caldas, C. , Zhai, D. , Yeiser, J. , & Homm, D. . (2011). Model to predict the impact of a technology on construction productivity. Journal of construction engineering and management, 137(9), 678-688. Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000328
Razavi, S. N. , & Haas, C. T. . (2011). Using reference RFID tags for calibrating the estimated locations of construction materials. Automation in Construction, 20(6), 677-685. Retrieved from https://doi.org/10.1016/j.autcon.2010.12.009
Shahandashti, S. Mohsen, Razavi, S. N. , Soibelman, L. , Berges, M. , Caldas, C. H. , Brilakis, I. , Teizer, J. , et al. (2011). Data-fusion approaches and applications for construction engineering. Journal of construction engineering and management, 137(10), 863-869. Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000287
Rehan, R. , Knight, M. A. , Haas, C. T. , & Unger, A. J. A. . (2011). Application of system dynamics for developing financially self-sustaining management policies for water and wastewater systems. Water research, 45(16), 4737-4750. Retrieved from https://doi.org/10.1016/j.watres.2011.06.001
Young, D. A. , Haas, C. T. , Goodrum, P. , & Caldas, C. . (2011). Improving construction supply network visibility by using automated materials locating and tracking technology. Journal of Construction Engineering and Management, 137(11), 976-984. Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000364
Gouett, M. C. , Haas, C. T. , Goodrum, P. M. , & Caldas, C. H. . (2011). Activity analysis for direct-work rate improvement in construction. Journal of Construction Engineering and Management, 137(12), 1117-1124. Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000375
Ahmed, M. , Haas, C. T. , & Haas, R. . (2011). Toward low-cost 3D automatic pavement distress surveying: the close range photogrammetry approach. Canadian Journal of Civil Engineering, 38(12), 1301-1313. Retrieved from https://doi.org/10.1139/l11-088
Gouett, M. C. , Haas, C. T. , Goodrum, P. M. , & Caldas, C. H. . (2011). Activity analysis for direct-work rate improvement in construction. Journal of Construction Engineering and Management, 137 (12), pp. 1117-1124. Retrieved from https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29CO.1943-7862.0000375
Ahmed, M. , Haas, R. , & Haas, C. . (2011). Toward Low-Cost 3D Automatic Pavement Distress Surveying: The Close Range Photogrammetry Approach. Canadian Journal of Civil Engineering, 38(12), pp. 1301-1313.
Rehan, R. , Knight, M. , Unger, A. , & Haas, C. . (2011). Application of System Dynamics for developing financially self-sustaining management policies for water and wastewater systems. Water Research 45 (16), pp. 4737-4750.
2010
Ahmed, M. Fouad, & Haas, C. . (2010). Potential of low-cost, close-range photogrammetry toward unified automatic pavement distress surveying. Transportation Research Board 89th Annual MeetingTransportation Research Board, (10-0825). Retrieved from https://trid.trb.org/view/909660
Young, D. , Nasir, H. , Razavi, S. , Haas, C. , Goodrum, P. , & Caldas, C. . (2010). Automated materials tracking and locating: impact modeling and estimation. In Construction Research Congress 2010: Innovation for Reshaping Construction Practice (pp. 41-50). Retrieved from https://doi.org/10.1061/41109(373)5
Turkan, Y. , Bosche, F. , Haas, C. T. , & Haas, R. . (2010). Towards automated progress tracking of erection of construction of concrete structures. Proceedings, Sixth International Conference on Innovation in Architecture, Engineering and Construction. Retrieved from http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.716.4785

Pages