Publications
Method for applying powder to a printed sheet and printing press for carrying out the method. US Patent No. 8757061. Retrieved from https://patents.google.com/patent/US8757061B2/en
. (2014). Quality assurance for high-frequency mechanical impact (HFMI) treatment of welds using handheld 3D laser scanning technology. Welding in the World, 59(3), 391-400. Retrieved from https://link.springer.com/article/10.1007/s40194-014-0210-3
. (2015). Benchmark performance indicators for utility water and wastewater pipelines infrastructure. Journal of Water Resources Planning and Management, 144(3), 04018003. Retrieved from https://doi.org/10.1061/(ASCE)WR.1943-5452.0000890
Benchmark-Performance-Indicators-for-Utility-Water-and-Wastewater-Pipelines-Infrastructure.pdf
. (2018). INTEGRATED ASSET MANAGEMENT OF WATER AND WASTEWATER INFRASTRUCTURE SYSTEMS—BORROWING FROM INDUSTRY FOUNDATION CLASSES. International Construction Specialty Conference of the Canadian Society for Civil Engineering. Retrieved from https://www.researchgate.net/profile/Amin-Ganjidoost/publication/319490999_INTEGRATED_ASSET_MANAGEMENT_OF_WATER_AND_WASTEWATER_INFRASTRUCTURE_SYSTEMS-BORROWING_FROM_INDUSTRY_FOUNDATION_CLASSES/links/59aed670458515150e4738bc/INTEGRATED-ASSET-MANAGEMENT-OF-
. (2015). Risk-chasing behaviour in on-site construction decisions. Construction Management and Economics, 34(12), 845-858. Retrieved from https://doi.org/10.1080/01446193.2016.1207790
. (2016). Risk-chasing behaviour in on-site construction decisions. Construction Management and Economics, 34(12), 845-858. Retrieved from https://doi.org/10.1080/01446193.2016.1207790
. (2016). . (2015). Using Scan-to-BIM Techniques to Find Optimal Modeling Effort; A Methodology for Adaptive Reuse Projects. 36th International Symposium on Automation and Robotics in Construction. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=17835127049938182788&btnI=1&hl=en
7b996c8899d9c545acb544523ac777b2ed81.pdf
. (2019). Quantitative investigation on the accuracy and precision of Scan-to-BIM under different modelling scenarios. Automation in Construction, 126. Retrieved from https://doi.org/10.1016/j.autcon.2021.103686
. (2021). Prioritizing Preproject Planning Activities Using Value of Information Analysis. Journal of Management in Engineering, 36(5). Retrieved from https://doi.org/10.1061/(ASCE)ME.1943-5479.0000822
. (2020). Development of a Decision Making Methodology to Optimize the Process of Scope Definition Improvement: A Building Adaptive Reuse Case Study. In Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts (pp. 330-338). American Society of Civil Engineers. Retrieved from https://doi.org/10.1061/9780784482889.035
. (2020). Interface Health and Workload between Stakeholders in Complex Capital Projects: Assessment, Visualization, and Interpretation Using SNA. Journal of Management in Engineering, 37(3), 04021006. Retrieved from https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.0000891
. (2021). Usage of Interface Management in Adaptive Reuse of Buildings. In Advances in Informatics and Computing in Civil and Construction Engineering (pp. 725-731). Springer, Cham. Retrieved from https://doi.org/10.1007/978-3-030-00220-6_87
. (2019). Usage of interface management system in adaptive reuse of buildings. Buildings, 9(5), 105. Retrieved from https://doi.org/10.3390/buildings9050105
buildings-09-00105.pdf
. (2019). A model for measuring interface health between project stakeholders in complex construction projects. 7th CSCE/CRC International Construction Specialty Conference, Laval, Canada. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=4939819789623465796&btnI=1&hl=en
PaperPDFversion_172_0409041730.pdf
. (2019). A conceptual framework for tracking design completeness of Track Line discipline in MRT projects. International Symposium on Automation and Robotics in Construction. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=15401547300572318404&btnI=1&hl=en
. (2018). An overview on integrating interface management and building information management systems. In 6th CSCE-CRC International Construction Specialty Conference 2017 (pp. 196-205). Retrieved from https://www.researchgate.net/profile/Ekin-Eray/publication/320934456_An_overview_on_integrating_Interface_Management_and_Building_Information_Management_Systems/links/5a034e55a6fdcc8f6c5f776c/An-overview-on-integrating-Interface-Management-and-Building-In
. (2017). Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory. Journal of Construction Engineering and Management, 146(2). Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0001747
. (2020). Probabilistic risk management framework for tolerance-related issues in modularized projects: local and global perspectives. ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, 6(1). Retrieved from https://doi.org/10.1061/AJRUA6.0001036
. (2020). Integrated risk management framework for tolerance-based mitigation strategy decision support in modular construction projects. Journal of Management in Engineering, 35(4). Retrieved from https://doi.org/10.1061/(ASCE)ME.1943-5479.0000698
. (2019).