Publications
Rapid tracking of pipe-works progress using digital photogrammetry. Proceedings of the 9th Construction Specialty Conference. Retrieved from https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=6925103191493667810
. (2011). Rapid, On-Site Spatial Information Acquisition and its Use for Infrastructure Operation and Maintenance. Automation in Construction, Vol 14/5, pp.666-684.
. (2005). Rapid Geometric Modeling for Unstructured Construction Workspaces. Computer-Aided Civil and Infrastructure Engineering, pp. 242-253, no. 18.
. (2003). Rail corrosion forensics using 3D imaging and finite element analysis. International Journal of Rail Transportation, 3(3), 164-178. Retrieved from https://doi.org/10.1080/23248378.2015.1054622
. (2015). Quantitative investigation on the accuracy and precision of Scan-to-BIM under different modelling scenarios. Automation in Construction, 126. Retrieved from https://doi.org/10.1016/j.autcon.2021.103686
. (2021). A Quantitative Comparison of Adaptive Reuse Strategies of Residential Towers in Northern Climates. EG-ICE. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=12295065544968536416&btnI=1&hl=en
paper04.pdf
. (2018). Quality assurance for high-frequency mechanical impact (HFMI) treatment of welds using handheld 3D laser scanning technology. Welding in the World, 59(3), 391-400. Retrieved from https://link.springer.com/article/10.1007/s40194-014-0210-3
. (2015). A proximity-based method for locating RFID tagged objects. Advanced Engineering Informatics, 21(4), 367-376. Retrieved from https://doi.org/10.1016/j.aei.2006.09.002
. (2007). Probabilistic risk management framework for tolerance-related issues in modularized projects: local and global perspectives. ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, 6(1). Retrieved from https://doi.org/10.1061/AJRUA6.0001036
. (2020). Prioritizing Preproject Planning Activities Using Value of Information Analysis. Journal of Management in Engineering, 36(5). Retrieved from https://doi.org/10.1061/(ASCE)ME.1943-5479.0000822
. (2020). A preliminary investigation into automated identification of structural steel without a priori knowledge. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 31(1). Retrieved from https://d1wqtxts1xzle7.cloudfront.net/48932510/A_Preliminary_Investigation_into_Automat20160918-30849-8g2oiy.pdf?1474207998=&response-content-disposition=inline%3B+filename%3DA_Preliminary_Investigation_into_Automat.pdf&Expires=1618411969&Signature=XVEfnY
. (2014). Potential of low-cost, close-range photogrammetry toward unified automatic pavement distress surveying. Transportation Research Board 89th Annual MeetingTransportation Research Board, (10-0825). Retrieved from https://trid.trb.org/view/909660
. (2010). Potential economic and energy impacts of substituting adaptive reuse for new building construction: A case study of Ontario. Journal of Cleaner Production, 259. Retrieved from https://doi.org/10.1016/j.jclepro.2020.120939
. (2020). Pipe spool recognition in cluttered point clouds using a curvature-based shape descriptor, Automation in Construction. Automation in Construction, volume: 71, p: 346-358. Retrieved from http://www.sciencedirect.com/science/article/pii/S0926580516301650
. (2016). Pipe radius estimation using Kinect range cameras. Automation in construction, 99, 197-205. Retrieved from https://doi.org/10.1016/j.autcon.2018.12.015
. (2019). PIECE 3D: Portable Interactive Education for Construction Engineering in 3D. International Symposium on Automation and Robotics in Construction. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=12043666691639473230&btnI=1&hl=en
. (2018). Performance of automated project progress tracking with 3D data fusion. CSCE 2008 Annual Conference. Retrieved from https://pure.hw.ac.uk/ws/files/785787/CSCE_2008_CO_449_Final.pdf
. (2008). Partial Factor Productivity and Equipment Technology Change at the Activity Level in the U.S. Construction Industry. ASCE Journal of Construction Engineering and Management, Vol. 128, no.6, pp 463-472.
. (2002). Parallel systems and structural frames realignment planning and actuation strategy. Journal of Computing in Civil Engineering, 30(4). Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000545
. (2016). An overview on integrating interface management and building information management systems. In 6th CSCE-CRC International Construction Specialty Conference 2017 (pp. 196-205). Retrieved from https://www.researchgate.net/profile/Ekin-Eray/publication/320934456_An_overview_on_integrating_Interface_Management_and_Building_Information_Management_Systems/links/5a034e55a6fdcc8f6c5f776c/An-overview-on-integrating-Interface-Management-and-Building-In
. (2017).