Publications
A model of construction contractor selection using competitive intelligence (CI). Retrieved from http://dspace.lincoln.ac.nz/handle/10182/6304
. (2014). A model for measuring interface health between project stakeholders in complex construction projects. 7th CSCE/CRC International Construction Specialty Conference, Laval, Canada. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=4939819789623465796&btnI=1&hl=en PaperPDFversion_172_0409041730.pdf
. (2019). A model for implementing & continuously improving the automated change management process for construction mega projects. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30(1). Retrieved from https://www.semanticscholar.org/paper/A-Model-for-Implementing-%26-Continuously-Improving-Karimidorabati-Haas/c1469d02555ff18336cb39de6f8d9f4f908d50a5?p2df
. (2013). Metric for Automated Detection and Identification of 3D CAD Elements in 3D Scanned Data. In 2007 ASCE Construction Research Congress. Retrieved from http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.717.7969&rep=rep1&type=pdf
. (2007). A methodology to analyze the net environmental impacts and building’s cost performance of an adaptive reuse project: a case study of the Waterloo County Courthouse renovations. Environment Systems and Decisions, 39(4), 419-438. Retrieved from https://doi.org/10.1007/s10669-019-09734-2
. (2019). Methodology for improving the net environmental impacts of new buildings through product recovery management. Civil Engineering. Retrieved from http://hdl.handle.net/10012/14537 sanchez_benjamin.pdf
. (2019). Method to assess the level of implementation of productivity practices on industrial projects, 141(1). Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000919
. (2015). Method of controlling a powder sprayer and printing press having a powder sprayer. US Patent No. 7942096. Retrieved from https://patents.google.com/patent/US7942096B2/en
. (2011). Method for applying powder to a printed sheet and printing press for carrying out the method. US Patent No. 8757061. Retrieved from https://patents.google.com/patent/US8757061B2/en
. (2014). Measuring the Impacts of Rework on Construction Cost Performance. ASCE Journal of Construction Engineering and Management, Vol. 135, No. 3, pp. 187-198.
. (2009). Measuring the impact of rework on construction cost performance. Journal of construction engineering and management, 135(3), 187-198. Retrieved from https://doi.org/10.1061/(ASCE)0733-9364(2009)135:3(187)
. (2009). Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management, 135 (3), pp. 187-198. Retrieved from https://ascelibrary.org/doi/abs/10.1061/%28ASCE%290733-9364%282009%29135%3A3%28187%29
. (2009). Managing risk in modular construction using dimensional and geometric tolerance strategies. Automation in Construction, volume 83, p: 303-305. Retrieved from http://www.sciencedirect.com/science/article/pii/S0926580517302340
. (2017). Locating sensor nodes on construction projects. Autonomous Robots, 22(3), 255-263. Retrieved from https://link.springer.com/article/10.1007/s10514-006-9720-1
. (2007). Locating Sensor Nodes on Construction Projects. Autonomous Robots, 10.1007/s10514-006-9720-1.
. (2006). Leveraging Materials Tracking Technologies to Improve Industrial Project Performance. Managing IT in Construction/Managing Construction for Tomorrow, 181. Retrieved from https://books.google.ca/books?hl=en&lr=&id=B0NZDwAAQBAJ&oi=fnd&pg=PA181&ots=dCFhSJ5ZO5&sig=P1q3NKkiXOp2dEPfM8noLUcRz9k#v=onepage&q&f=false
. (2009). Level-of-Expertise Classification for Identifying Safe and Productive Masons. In Computing in Civil Engineering (pp. 359-368). Retrieved from https://doi.org/10.1061/9780784480823.043
. (2017). Labour productivity improvement through the use of best practices for infrastructure construction projects. Proc., 4th Construction Specialty Conf., Canadian Society for Civil Engineering. Retrieved from https://www.researchgate.net/profile/Hassan-Nasir-4/publication/289593527_Labour_productivity_improvement_through_the_use_of_best_practices_for_infrastructure_construction_projects/links/5caef0eb4585156cd78f6fdb/Labour-productivity-improvement-through-the
. (2013). Kinematics chain based dimensional variation analysis of construction assemblies using building information models and 3D point clouds. Automation in Construction, 75(33-44). Retrieved from https://doi.org/10.1016/j.autcon.2016.12.001
. (2017). Jerk as an indicator of physical exertion and fatigue. Automation in Construction, 104, 120-128. Retrieved from https://doi.org/10.1016/j.autcon.2019.04.016
. (2019).