Publications
ISARC 2013. In Automation in Construction (Vol. 49, pp. 175-175). Retrieved from https://doi.org/10.1016/j.autcon.2014.11.002
. (2015). Investigation of the effects of air temperature and speed on performance of piezoelectric weigh-in-motion systems. Canadian Journal of Civil Engineering, 40(10), 935-944. Retrieved from https://doi.org/10.1139/cjce-2012-0227
. (2013). Investigation of the effect of weight factor on performance of piezoelectric weigh-in-motion sensors. Journal of Transportation Engineering, 139 (9), pp. 913-922.
. (2013). Investigation of Piezoelectric Weigh-in-Motion Sensors’ Performance in Asphalt Concrete Pavements in Cold Temperatures of Southern Ontario. Transportation Research Board 91st Annual MeetingTransportation Research Board, (12-1484). Retrieved from https://trid.trb.org/view/1129278
. (2012). Investigation for Traffic Monitoring Equipment Evaluation Facility. Retrieved from https://trid.trb.org/view/804183
. (2007). Interface-management process for managing risks in complex capital projects. Journal of Construction Engineering and Management, 142(2). Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000990
. (2016). Interface-management process for managing risks in complex capital projects. Journal of Construction Engineering and Management, 142 (2). Retrieved from https://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943-7862.0000990
. (2016). Interface management model for mega capital projects. Retrieved from https://doi.org/10.1061/9780784412329.045
. (2012). Interface Health and Workload between Stakeholders in Complex Capital Projects: Assessment, Visualization, and Interpretation Using SNA. Journal of Management in Engineering, 37(3), 04021006. Retrieved from https://ascelibrary.org/doi/abs/10.1061/%28ASCE%29ME.1943-5479.0000891
. (2021). Integration of Diverse Technologies for Pavement Sensing. The National Research Council's Transportation Research Record, No. 1311, pp. 92-102.
. (1991). Integrated risk management framework for tolerance-based mitigation strategy decision support in modular construction projects. Journal of Management in Engineering, 35(4). Retrieved from https://doi.org/10.1061/(ASCE)ME.1943-5479.0000698
. (2019). An integrated quality management system for piping fabrication using 3D laser scanning and photogrammetry. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30, 1. Retrieved from https://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.1038.8848&rep=rep1&type=pdf
. (2013). An integrated productivity-practices implementation index for planning the execution of infrastructure projects. Journal of Infrastructure Systems, 22(2). Retrieved from https://doi.org/10.1061/(ASCE)IS.1943-555X.0000275
. (2016). INTEGRATED ASSET MANAGEMENT OF WATER AND WASTEWATER INFRASTRUCTURE SYSTEMS—BORROWING FROM INDUSTRY FOUNDATION CLASSES. International Construction Specialty Conference of the Canadian Society for Civil Engineering. Retrieved from https://www.researchgate.net/profile/Amin-Ganjidoost/publication/319490999_INTEGRATED_ASSET_MANAGEMENT_OF_WATER_AND_WASTEWATER_INFRASTRUCTURE_SYSTEMS-BORROWING_FROM_INDUSTRY_FOUNDATION_CLASSES/links/59aed670458515150e4738bc/INTEGRATED-ASSET-MANAGEMENT-OF-
. (2015). Innovation in Construction Health, Safety and Environmental Research. Retrieved from https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=16073874340119273326
. (2016). Initial metrics and pilot program results for measuring the performance of the Canadian construction industry. Canadian Journal of Civil Engineering, 35 (9), pp. 894-907.
. (2008). Infrastructure computer vision (p. 408). Butterworth-Heinemann. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=7047206967977233061&btnI=1&hl=en
. (2019). Infrastructure computer vision. Advanced Engineering Informatics, 2(29), 147-148. Retrieved from https://www.infona.pl/resource/bwmeta1.element.elsevier-103f8c69-a679-3482-9824-180c83b55b8c
. (2015). Improving the Quality of Event Logs in the Construction Industry for Process Mining. 36th International Symposium on Automation and Robotics in Construction. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=4350659542287279027&btnI=1&hl=en 65f63db365a0f40108eb125b17073ff83ef4.pdf
. (2019). Improving sustainable office building operation by using historical data and linear models to predict energy usage. Sustainable Cities and Society, 29, 107-117. Retrieved from https://doi.org/10.1016/j.scs.2016.12.001
. (2017).