Publications
Evaluation of automation levels for construction change management. Engineering, construction and architectural management. Retrieved from https://doi.org/10.1108/ECAM-01-2015-0013
. (2016). Annual Conference of the Transportation Association of Canada, 1-17. Retrieved from https://www.researchgate.net/profile/Carl-Haas/publication/228452225_Evaluating_Weigh-In-Motion_Sensing_Technology_for_Traffic_Data_Collection/links/571a2c8808aee3ddc568ef7c/Evaluating-Weigh-In-Motion-Sensing-Technology-for-Traffic-Data-Collection.pdf
. (2007). Evaluating artificial intelligence tools for automated practice conformance checking. International Symposium on Automation and Robotics in Construction. Retrieved from https://doi.org/10.22260/isarc2018%2F0015
. (2018). Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory. Journal of Construction Engineering and Management, 146(2). Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0001747
. (2020). Dislocation detection in field environments: A belief functions contribution. Expert Systems with Applications, 39(10), 8505-8513. Retrieved from https://doi.org/10.1016/j.eswa.2011.12.014
. (2012). Dimensional variability analysis of construction assemblies using kinematics chains and building information model, 34. Retrieved from https://www.semanticscholar.org/paper/Dimensional-Variability-Analysis-of-Construction-Nahangi-Haas/a67265a486d24be97b4980f5f0d37fb8ad4a4d45?p2df
. (2017). Device for powdering printed sheets in a printing press, and printing press with a powdering device. US Patent No. 13191957. Retrieved from https://patents.google.com/patent/US20120024175A1/en
. (2012). Development of frost and thaw depth predictors for decision making about variable load restrictions. Transportation research record, 2053(1), 1-8. Retrieved from https://doi.org/10.3141%2F2053-01
. (2008). Development of an internal benchmarking and metrics model for industrial construction enterprises for productivity improvement. Canadian Journal of Civil Engineering, 44(7), 518-529. Retrieved from https://scholar.google.ca/citations?hl=en&user=lmA9rO4AAAAJ&view_op=list_works&sortby=pubdate#d=gs_md_cita-d&u=%2Fcitations%3Fview_op%3Dview_citation%26hl%3Den%26user%3DlmA9rO4AAAAJ%26cstart%3D20%26pagesize%3D80%26sortby%3Dpubdate%26citation_for_view%3Dlm
. (2017). Development of a system dynamics model for financially sustainable management of municipal watermain networks. Water research, 47(20), 7184-7205. Retrieved from https://doi.org/10.1016/j.watres.2013.09.061
. (2013). Development of a Decision Making Methodology to Optimize the Process of Scope Definition Improvement: A Building Adaptive Reuse Case Study. In Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts (pp. 330-338). American Society of Civil Engineers. Retrieved from https://doi.org/10.1061/9780784482889.035
. (2020). Development and implementation of a construction performance and productivity benchmarking program, 3, 1896-1905. Retrieved from https://espace2.etsmtl.ca/id/eprint/4258/
. (2011). Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement. Canadian Journal of Civil Engineering, 39(9), 957-967. Retrieved from https://doi.org/10.1139/l2012-030
. (2012). Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement. Canadian Journal of Civil Engineering 39 (9), pp. 957-967.
. (2012). DETERMINING CRITICAL CONSTRUCTION DOCUMENTS THROUGH KNOWLEDGE DISCOVERY. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30(1). Retrieved from https://www.semanticscholar.org/paper/Determining-Critical-Construction-Documents-through-Chettupuzha-Haas/3bffdf7849dd1a36616666c031e3cb58d7766344?p2df
. (2013). Deterioration of UWB positioning during construction. Automation in Construction, 24, 72-80. Retrieved from https://doi.org/10.1016/j.autcon.2012.02.009
. (2012). Derivation of Minimum Required Model for Augmented Reality Based Stepwise Construction Assembly Control. In Workshop of the European Group for Intelligent Computing in Engineering (Vol. 10863, pp. 336-358). Springer, Cham. Retrieved from https://doi.org/10.1007/978-3-319-91635-4_18
. (2018). Deploying 3D scanning based geometric digital twins during fabrication and assembly in offsite manufacturing. International Journal of Construction Management, 1-14. Retrieved from https://doi.org/10.1080/15623599.2021.1896942
. (2021). A definition framework for building adaptation projects. Sustainable Cities and Society, 63, 102345. Retrieved from https://doi.org/10.1016/j.scs.2020.102345
. (2020). Deconstruction programming for adaptive reuse of buildings. Automation in Construction, 107. Retrieved from https://doi.org/10.1016/j.autcon.2019.102921
. (2019).