Publications

Search
Author [ Title(Asc)] Type Year
D
Enshassi, M. S. A. , Walbridge, S. , West, J. S. , & Haas, C. T. . (2020). Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory. Journal of Construction Engineering and Management, 146(2). Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0001747
Razavi, S. Navabzadeh, Duflos, E. , Haas, C. , & Vanheeghe, P. . (2012). Dislocation detection in field environments: A belief functions contribution. Expert Systems with Applications, 39(10), 8505-8513. Retrieved from https://doi.org/10.1016/j.eswa.2011.12.014
Nahangi, M. , Rausch, C. , Haas, C. T. , & West, J. . (2017). Dimensional variability analysis of construction assemblies using kinematics chains and building information model, 34. Retrieved from https://www.semanticscholar.org/paper/Dimensional-Variability-Analysis-of-Construction-Nahangi-Haas/a67265a486d24be97b4980f5f0d37fb8ad4a4d45?p2df
Haas, C. . (2012). Device for powdering printed sheets in a printing press, and printing press with a powdering device. US Patent No. 13191957. Retrieved from https://patents.google.com/patent/US20120024175A1/en
Baiz, S. , Tighe, S. L. , Haas, C. T. , Mills, B. , & Perchanok, M. . (2008). Development of frost and thaw depth predictors for decision making about variable load restrictions. Transportation research record, 2053(1), 1-8. Retrieved from https://doi.org/10.3141%2F2053-01
Zhang, D. , Nasir, H. , & Haas, C. T. . (2017). Development of an internal benchmarking and metrics model for industrial construction enterprises for productivity improvement. Canadian Journal of Civil Engineering, 44(7), 518-529. Retrieved from https://scholar.google.ca/citations?hl=en&user=lmA9rO4AAAAJ&view_op=list_works&sortby=pubdate#d=gs_md_cita-d&u=%2Fcitations%3Fview_op%3Dview_citation%26hl%3Den%26user%3DlmA9rO4AAAAJ%26cstart%3D20%26pagesize%3D80%26sortby%3Dpubdate%26citation_for_view%3Dlm
Rehan, R. , Knight, M. A. , Unger, A. J. A. , & Haas, C. T. . (2013). Development of a system dynamics model for financially sustainable management of municipal watermain networks. Water research, 47(20), 7184-7205. Retrieved from https://doi.org/10.1016/j.watres.2013.09.061
Esfahani, M. Esnaashary, Rausch, C. , Haas, C. , & Adey, B. T. . (2020). Development of a Decision Making Methodology to Optimize the Process of Scope Definition Improvement: A Building Adaptive Reuse Case Study. In Construction Research Congress 2020: Project Management and Controls, Materials, and Contracts (pp. 330-338). American Society of Civil Engineers. Retrieved from https://doi.org/10.1061/9780784482889.035
Nasir, H. , Haas, C. , Fayek, A. R. , Forgues, D. , Rankin, J. , & Ruwanpura, J. . (2011). Development and implementation of a construction performance and productivity benchmarking program, 3, 1896-1905. Retrieved from https://espace2.etsmtl.ca/id/eprint/4258/
Nasir, H. , Haas, C. T. , Rankin, J. H. , Fayek, A. Robinson, Forgues, D. , & Ruwanpura, J. . (2012). Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement. Canadian Journal of Civil Engineering, 39(9), 957-967. Retrieved from https://doi.org/10.1139/l2012-030
Nasir, H. , Haas, C. , Forgues, D. , Fayek, A. , Ruwanpura, J. , & Rankin, J. . (2012). Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement. Canadian Journal of Civil Engineering 39 (9), pp. 957-967.
Chettupuzha, A. J. Antony, Haas, C. T. , Gray, J. , & Simonson, R. . (2013). DETERMINING CRITICAL CONSTRUCTION DOCUMENTS THROUGH KNOWLEDGE DISCOVERY. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30(1). Retrieved from https://www.semanticscholar.org/paper/Determining-Critical-Construction-Documents-through-Chettupuzha-Haas/3bffdf7849dd1a36616666c031e3cb58d7766344?p2df
Shahi, A. , Aryan, A. , West, J. S. , Haas, C. T. , & Haas, R. C. G. . (2012). Deterioration of UWB positioning during construction. Automation in Construction, 24, 72-80. Retrieved from https://doi.org/10.1016/j.autcon.2012.02.009
Jeanclos, N. , Sharif, M. - M. , Li, S. Kun, Kwiatek, C. , & Haas, C. . (2018). Derivation of Minimum Required Model for Augmented Reality Based Stepwise Construction Assembly Control. In Workshop of the European Group for Intelligent Computing in Engineering (Vol. 10863, pp. 336-358). Springer, Cham. Retrieved from https://doi.org/10.1007/978-3-319-91635-4_18
Rausch, C. , Lu, R. , Talebi, S. , & Haas, C. . (2021). Deploying 3D scanning based geometric digital twins during fabrication and assembly in offsite manufacturing. International Journal of Construction Management, 1-14. Retrieved from https://doi.org/10.1080/15623599.2021.1896942
Shahi, S. , Esfahani, M. Esnaashary, Bachmann, C. , & Haas, C. . (2020). A definition framework for building adaptation projects. Sustainable Cities and Society, 63, 102345. Retrieved from https://doi.org/10.1016/j.scs.2020.102345
Sanchez, B. , Rausch, C. , & Haas, C. . (2019). Deconstruction programming for adaptive reuse of buildings. Automation in Construction, 107. Retrieved from https://doi.org/10.1016/j.autcon.2019.102921

Pages