Publications

Search
Author [ Title(Desc)] Type Year
O
Shahi, A. , Haas, C. , & West, J. . (2013). Onsite 3D Marking for Construction Activity Tracking. Automation in Construction 30 (2013) 136–143.
Zhao, Y. , Rausch, C. , & Haas, C. . (2021). Optimizing 3D Irregular Object Packing from 3D Scans Using Metaheuristics. Advanced Engineering Informatics, 47, 101234. Retrieved from https://doi.org/10.1016/j.aei.2020.101234
Safa, M. , Yee, M. - H. , Rayside, D. , & Haas, C. T. . (2016). Optimizing contractor selection for construction packages in capital projects. Journal of Computing in Civil Engineering, 30(5). Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000555
Rausch, C. , Nahangi, M. , Perreault, M. , Haas, C. T. , & West, J. . (2017). Optimum assembly planning for modular construction components. Journal of computing in civil engineering, 31(1). Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000605
Nahangi, M. , Rausch, C. , & Haas, C. . (2016). Optimum assembly planning for modular construction using BIM and 3D point clouds. Modular and Offsite Construction (MOC) Summit Proceedings. Retrieved from https://doi.org/10.29173/mocs7
Nahangi, M. , Rausch, C. , & Haas, C. . (2016). Optimum assembly planning for modular construction using BIM and 3D point clouds. Modular and Offsite Construction (MOC) Summit Proceedings. Retrieved from https://doi.org/10.29173/mocs7
Eray, E. , Golzarpoo, B. , Rayside, D. , & Haas, C. . (2017). An overview on integrating interface management and building information management systems. In 6th CSCE-CRC International Construction Specialty Conference 2017 (pp. 196-205). Retrieved from https://www.researchgate.net/profile/Ekin-Eray/publication/320934456_An_overview_on_integrating_Interface_Management_and_Building_Information_Management_Systems/links/5a034e55a6fdcc8f6c5f776c/An-overview-on-integrating-Interface-Management-and-Building-In
P
Nahangi, M. , Czerniawski, T. , Haas, C. T. , Walbridge, S. , & West, J. . (2016). Parallel systems and structural frames realignment planning and actuation strategy. Journal of Computing in Civil Engineering, 30(4). Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000545
Goodrum, P. , & Haas, C. . (2002). Partial Factor Productivity and Equipment Technology Change at the Activity Level in the U.S. Construction Industry. ASCE Journal of Construction Engineering and Management, Vol. 128, no.6, pp 463-472.
Bosché, F. , Haas, C. T. , & Murray, P. . (2008). Performance of automated project progress tracking with 3D data fusion. CSCE 2008 Annual Conference. Retrieved from https://pure.hw.ac.uk/ws/files/785787/CSCE_2008_CO_449_Final.pdf
Kang, S. , Cho, H. , Kang, K. , Kang, M. , & Haas, C. T. . (2018). PIECE 3D: Portable Interactive Education for Construction Engineering in 3D. International Symposium on Automation and Robotics in Construction. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=12043666691639473230&btnI=1&hl=en
Nahangi, M. , Czerniawski, T. , Haas, C. T. , & Walbridge, S. . (2019). Pipe radius estimation using Kinect range cameras. Automation in construction, 99, 197-205. Retrieved from https://doi.org/10.1016/j.autcon.2018.12.015
Czerniawski, T. , Nahangi, M. , Haas, C. , & Walbridge, S. . (2016). Pipe spool recognition in cluttered point clouds using a curvature-based shape descriptor, Automation in Construction. Automation in Construction, volume: 71, p: 346-358. Retrieved from http://www.sciencedirect.com/science/article/pii/S0926580516301650
Chan, J. , Bachmann, C. , & Haas, C. . (2020). Potential economic and energy impacts of substituting adaptive reuse for new building construction: A case study of Ontario. Journal of Cleaner Production, 259. Retrieved from https://doi.org/10.1016/j.jclepro.2020.120939
Ahmed, M. Fouad, & Haas, C. . (2010). Potential of low-cost, close-range photogrammetry toward unified automatic pavement distress surveying. Transportation Research Board 89th Annual MeetingTransportation Research Board, (10-0825). Retrieved from https://trid.trb.org/view/909660
Yeung, J. , Nahangi, M. , Walbridge, S. , & Haas, C. T. . (2014). A preliminary investigation into automated identification of structural steel without a priori knowledge. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 31(1). Retrieved from https://d1wqtxts1xzle7.cloudfront.net/48932510/A_Preliminary_Investigation_into_Automat20160918-30849-8g2oiy.pdf?1474207998=&response-content-disposition=inline%3B+filename%3DA_Preliminary_Investigation_into_Automat.pdf&Expires=1618411969&Signature=XVEfnY
Esfahani, M. Esnaashary, Rausch, C. , Haas, C. , & Adey, B. T. . (2020). Prioritizing Preproject Planning Activities Using Value of Information Analysis. Journal of Management in Engineering, 36(5). Retrieved from https://doi.org/10.1061/(ASCE)ME.1943-5479.0000822
Enshassi, M. S. A. , Walbridge, S. , West, J. S. , & Haas, C. T. . (2020). Probabilistic risk management framework for tolerance-related issues in modularized projects: local and global perspectives. ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, 6(1). Retrieved from https://doi.org/10.1061/AJRUA6.0001036
Song, J. , Haas, C. T. , & Caldas, C. H. . (2007). A proximity-based method for locating RFID tagged objects. Advanced Engineering Informatics, 21(4), 367-376. Retrieved from https://doi.org/10.1016/j.aei.2006.09.002
Q
Ghahremani, K. , Safa, M. , Yeung, J. , Walbridge, S. , Haas, C. , & Dubois, S. . (2015). Quality assurance for high-frequency mechanical impact (HFMI) treatment of welds using handheld 3D laser scanning technology. Welding in the World, 59(3), 391-400. Retrieved from https://link.springer.com/article/10.1007/s40194-014-0210-3

Pages