Publications

Search
Author Title Type [ Year(Desc)]
2013
Shokri, S. , Haas, C. T. , Haas, R. C. G. , Maloney, K. , & MacGillivray, S. . (2013). How to identify the critical stakeholders in an interface management system?. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30(1). Retrieved from https://www.semanticscholar.org/paper/How-to-Identify-the-Critical-Stakeholders-in-an-Shokri-Haas/aa27c07e116412f5c443eedfef19edb880f86398?p2df
Chettupuzha, A. J. Antony, Haas, C. T. , Gray, J. , & Simonson, R. . (2013). DETERMINING CRITICAL CONSTRUCTION DOCUMENTS THROUGH KNOWLEDGE DISCOVERY. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30(1). Retrieved from https://www.semanticscholar.org/paper/Determining-Critical-Construction-Documents-through-Chettupuzha-Haas/3bffdf7849dd1a36616666c031e3cb58d7766344?p2df
Nasir, H. , Haas, C. , Shahtaheri, M. , Caldas, C. , & Goodrum, P. . (2013). Labour productivity improvement through the use of best practices for infrastructure construction projects. Proc., 4th Construction Specialty Conf., Canadian Society for Civil Engineering. Retrieved from https://www.researchgate.net/profile/Hassan-Nasir-4/publication/289593527_Labour_productivity_improvement_through_the_use_of_best_practices_for_infrastructure_construction_projects/links/5caef0eb4585156cd78f6fdb/Labour-productivity-improvement-through-the
Shahi, A. , West, J. S. , & Haas, C. T. . (2013). Onsite 3D marking for construction activity tracking. Automation in construction, 30, 136-143. Retrieved from https://doi.org/10.1016/j.autcon.2012.11.027
Turkan, Y. , Bosche, F. , Haas, C. T. , & Haas, R. . (2013). Toward automated earned value tracking using 3D imaging tools. Journal of construction engineering and management, 139(4), 423-433. Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000629
Rehan, R. , Knight, M. A. , Unger, A. J. A. , & Haas, C. T. . (2013). Development of a system dynamics model for financially sustainable management of municipal watermain networks. Water research, 47(20), 7184-7205. Retrieved from https://doi.org/10.1016/j.watres.2013.09.061
Ahmed, M. , Haas, R. , & Haas, C. . (2013). Automatic Detection of Cylindrical Objects in Built Facilities. Computing in Civil Engineering, 28 (3), 04014009.
Vaziri, S. H. , Haas, C. T. , Rothenburg, L. , & Haas, R. C. . (2013). Investigation of the effect of weight factor on performance of piezoelectric weigh-in-motion sensors. Journal of Transportation Engineering, 139 (9), pp. 913-922.
Shahi, A. , Haas, C. , & West, J. . (2013). Onsite 3D Marking for Construction Activity Tracking. Automation in Construction 30 (2013) 136–143.
2014
Rehan, R. , Knight, M. A. , Unger, A. J. A. , & Haas, C. T. . (2014). Financially sustainable management strategies for urban wastewater collection infrastructure–development of a system dynamics model. Tunnelling and Underground Space Technology, 39, 116-129. Retrieved from https://doi.org/10.1016/j.tust.2012.12.003
Rehan, R. , Unger, A. J. A. , Knight, M. A. , & Haas, C. T. . (2014). Financially sustainable management strategies for urban wastewater collection infrastructure–Implementation of a system dynamics model. Tunnelling and Underground Space Technology, 39, 102-115. Retrieved from https://doi.org/10.1016/j.tust.2012.12.004
Yeung, J. , Nahangi, M. , Shahtaheri, Y. , Haas, C. , Walbridge, S. , & West, J. . (2014). Comparison of methods used for detecting unknown structural elements in three-dimensional point clouds. Construction Research Congress 2014: Construction in a Global Network. Retrieved from https://doi.org/10.1061/9780784413517.097
Shokr, S. , Ahn, S. , Czerniawski, T. , Haas, C. T. , & Lee, S. Hyun. (2014). Current state of interface management in mega-construction projects. In Construction Research Congress 2014: Construction in a Global Network. Retrieved from https://doi.org/10.1061/9780784413517.230
Nahangi, M. , Safa, M. , Shahi, A. , & Haas, C. T. . (2014). Automated registration of 3D point clouds with 3D CAD models for remote assessment of staged fabrication. In Construction Research Congress 2014: Construction in a Global Network (pp. 1004-1013). Retrieved from https://doi.org/10.1061/9780784413517.103
Nahangi, M. , Yeung, J. , Amaral, J. , Freitas, F. N. , Walbridge, S. , & Haas, C. T. . (2014). Automated Deviation Analysis for As-Built Status Assessment of Steel Assemblies and Pipe Spools. In Computing in Civil and Building Engineering (pp. 2063-2070). Retrieved from https://doi.org/10.1061/9780784413616.256
Shan, Y. , Kim, J. Yeol, Goodrum, P. M. , Caldas, C. H. , & Haas, C. . (2014). Impact of steel quick connection system on steel erection labor productivity: case studies and simulation based analyses. Canadian Journal of Civil Engineering, 41(12). Retrieved from https://doi.org/10.1139/cjce-2014-0079
Shahi, A. , Haas, C. T. , West, J. S. , & Akinci, B. . (2014). Workflow-based construction research data management and dissemination. Journal of Computing in Civil Engineering, 28(2), 244-252. Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000251
Turkan, Y. , Bosche, F. , Haas, C. T. , & Haas, R. . (2014). Tracking of secondary and temporary objects in structural concrete work. Construction Innovation. Retrieved from https://doi.org/10.1108/CI-12-2012-0063
Ahmed, M. Fouad, Haas, C. T. , & Haas, R. . (2014). Automatic detection of cylindrical objects in built facilities. Journal of computing in Civil Engineering, 28(3). Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000329
Nasir, H. , Ahmed, H. , Haas, C. , & Goodrum, P. M. . (2014). An analysis of construction productivity differences between Canada and the United States. Construction Management and Economics, 32(6), 595-607. Retrieved from https://doi.org/10.1080/01446193.2013.848995

Pages