Publications
Assessing the management practices for small to medium sized Canadian general contractor organizations. Retrieved from https://doi.org/10.14288/1.0076493
. (2015). Motivation For Interface Management In Construction: A Project Complexity Perspective. 5th International/11th Construction Specialty Conference. Retrieved from https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=15930760848633137999
. (2015). Identifying influential factors for capital construction project planning strategies. Canadian Society for Civil Engineering Construction Specialty Conference. Retrieved from https://www.semanticscholar.org/paper/Identifying-influential-factors-for-capital-project-Safa-MacGillivray/33bc912b3f1105dde86612480ed48e79624c0728?p2df
. (2015). Infrastructure computer vision. Advanced Engineering Informatics, 2(29), 147-148. Retrieved from https://www.infona.pl/resource/bwmeta1.element.elsevier-103f8c69-a679-3482-9824-180c83b55b8c
. (2015). State of research in automatic as-built modelling. Advanced Engineering Informatics, 29(2), 162-171. Retrieved from https://doi.org/10.1016/j.aei.2015.01.001
. (2015). Numerical DAE approach for solving a system dynamics problem. Journal of Computing in Civil Engineering, 29(3). Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000349
. (2015). Quality assurance for high-frequency mechanical impact (HFMI) treatment of welds using handheld 3D laser scanning technology. Welding in the World, 59(3), 391-400. Retrieved from https://link.springer.com/article/10.1007/s40194-014-0210-3
. (2015). Setting baseline rates for on-site work categories in the construction industry. Journal of Construction Engineering and Management, 141(5). Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000959
. (2015). Automated 3D Shape Detection and Outlier Removal in Cluttered Laser Scans of Industrial Assemblies, 24-26. Retrieved from https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=9614116116457053865
. (2015). Risk Mitigation through Tolerance Strategies for Design in Modularization. Modular and Offsite Construction (MOC) Summit Proceedings. Retrieved from https://journalofindustrializedconstruction.com/index.php/mocs/article/view/166
. (2015). Implementation of Construction Industry Best Practices into Workflow Management Systems. Retrieved from https://www.semanticscholar.org/paper/Implementation-of-construction-industry-best-into-Golzarpoor-Haas/c3cd6df679dea9bb5cc5847b4f1884f9b9da10dd?p2df
. (2015). Classification of construction projects. Retrieved from https://uwspace.uwaterloo.ca/handle/10012/11560
(2015). Rail corrosion forensics using 3D imaging and finite element analysis. International Journal of Rail Transportation, 3(3), 164-178. Retrieved from https://doi.org/10.1080/23248378.2015.1054622
. (2015). Automating measurement process to improve quality management for piping fabrication. Structures, 3, 71-80. Retrieved from https://doi.org/10.1016/j.istruc.2015.03.003
. (2015). Automated assembly discrepancy feedback using 3D imaging and forward kinematics. Automation in Construction, 56, 36-46. Retrieved from https://doi.org/10.1016/j.autcon.2015.04.005
. (2015). Data fusion process management for automated construction progress estimation. Journal of Computing in Civil Engineering, 29(6). Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000436
. (2015). Competitive intelligence (CI) for evaluation of construction contractors. Automation in Construction, 59, 149-157. Retrieved from https://doi.org/10.1016/j.autcon.2015.02.009
. (2015). The role of geometric characterization in supporting structural steel reuse decisions. Resources, conservation and recycling, 104, 120-130. Retrieved from https://doi.org/10.1016/j.resconrec.2015.08.017
. (2015). Automated assembly discrepancy feedback using 3D imaging and forward kinematics. Automation in Construction, 56, pp. 36-46.
. (2015). The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components. Automation in Construction, 49, pp. 201-213. Retrieved from https://www.sciencedirect.com/science/article/pii/S0926580514001319
. (2015).