Publications
Activity-based data fusion for automated progress tracking of construction projects. Construction Research Congress 2012: Construction Challenges in a Flat World, 838-847. Retrieved from https://doi.org/10.1061/9780784412329.085
. (2012). Automated earned-value tracking. Gerontechnology, 11(2). Retrieved from https://researchportal.hw.ac.uk/en/publications/automated-earned-value-tracking
. (2012). Automated progress tracking using 4D schedule and 3D sensing technologies. Automation in construction, 22, 414-421. Retrieved from https://doi.org/10.1016/j.autcon.2011.10.003
. (2012). Interface management model for mega capital projects. Retrieved from https://doi.org/10.1061/9780784412329.045
. (2012). Deterioration of UWB positioning during construction. Automation in Construction, 24, 72-80. Retrieved from https://doi.org/10.1016/j.autcon.2012.02.009
. (2012). Risk management for design and construction. Construction Management and Economics, 30(8), 711-713. Retrieved from https://doi.org/10.1080/01446193.2012.690883
. (2012). Dislocation detection in field environments: A belief functions contribution. Expert Systems with Applications, 39(10), 8505-8513. Retrieved from https://doi.org/10.1016/j.eswa.2011.12.014
. (2012). Target-focused local workspace modeling for construction automation applications. Journal of Computing in Civil Engineering, 26(5), 661-670. Retrieved from https://doi.org/10.1061/(ASCE)CP.1943-5487.0000166
. (2012). Development and implementation of a benchmarking and metrics program for construction performance and productivity improvement. Canadian Journal of Civil Engineering, 39(9), 957-967. Retrieved from https://doi.org/10.1139/l2012-030
. (2012). Using digital photogrammetry for pipe-works progress tracking. Canadian Journal of Civil Engineering, 39(9), 1062-1071. Retrieved from https://doi.org/10.1139/l2012-055
. (2012). Automated progress tracking of erection of concrete structures. Annual Conference of the Canadian Society for Civil Engineering, 2746-2756. Retrieved from https://d1wqtxts1xzle7.cloudfront.net/5279938/Automated_Progress_Tracking_of_Erection_of_Concrete_Structures_-_Turkan_et_al.pdf?response-content-disposition=inline%3B+filename%3DAutomated_Progress_Tracking_of_Erection.pdf&Expires=1618601575&Signature=apS
. (2011). Accurate and Less Expensive Pavement Distress Surveying Using Multi-Photogrammetric-Output Fusion, (11-4312). Retrieved from Transportation Research Board 90th Annual MeetingTransportation Research Board
. (2011). Development and implementation of a construction performance and productivity benchmarking program, 3, 1896-1905. Retrieved from https://espace2.etsmtl.ca/id/eprint/4258/
. (2011). The impact of management practices on mechanical construction productivity. Construction Management and Economics, 29(3), 305-316. Retrieved from https://doi.org/10.1080/01446193.2010.538070
. (2011). Sensing construction work-related musculoskeletal disorders (WMSDs). ISARC Proc. Retrieved from https://www.researchgate.net/profile/Abdullatif-Alwasel/publication/234109255_Sensing_Construction_Work-Related_Musculoskeletal_Disorders_WMSDs/links/0deec5239c58dc410b000000/Sensing-Construction-Work-Related-Musculoskeletal-Disorders-WMSDs.pdf
. (2011). Formalisms for query capture and data source identification to support data fusion for construction productivity monitoring. Automation in Construction, 20(4), 389-398. Retrieved from https://doi.org/10.1016/j.autcon.2010.11.009
. (2011). Model to predict the impact of a technology on construction productivity. Journal of construction engineering and management, 137(9), 678-688. Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000328
. (2011). Using reference RFID tags for calibrating the estimated locations of construction materials. Automation in Construction, 20(6), 677-685. Retrieved from https://doi.org/10.1016/j.autcon.2010.12.009
. (2011). Data-fusion approaches and applications for construction engineering. Journal of construction engineering and management, 137(10), 863-869. Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000287
(2011). Application of system dynamics for developing financially self-sustaining management policies for water and wastewater systems. Water research, 45(16), 4737-4750. Retrieved from https://doi.org/10.1016/j.watres.2011.06.001
. (2011).