Publications
How to identify the critical stakeholders in an interface management system?. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 30(1). Retrieved from https://www.semanticscholar.org/paper/How-to-Identify-the-Critical-Stakeholders-in-an-Shokri-Haas/aa27c07e116412f5c443eedfef19edb880f86398?p2df
. (2013). History and renaissance of construction engineering and management in Canada. Journal of construction engineering and management, 133(9), 678-683. Retrieved from https://doi.org/10.1061/(ASCE)0733-9364(2007)133:9(678)
. (2007). Health and productivity impact of semi-automated work systems in construction. Automation in Construction, 120, 103396. Retrieved from https://doi.org/10.1016/j.autcon.2020.103396
. (2020). Graphical modeling and simulation for design and control of a tele-operated clinker clearing robot. Automation in construction, 16(1), 96-106. Retrieved from https://doi.org/10.1016/j.autcon.2005.12.002
. (2007). Geometric accuracy of digital twins for structural health monitoring. In Bridge Engineering. IntechOpen. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=8722062051834655463&btnI=1&hl=en 72444.pdf
. (2020). Fusing 4D modelling and laser scanning for construction schedule control. Proc. of the 26th Annual Conf. Association of Researchers in Construction Management. Retrieved from https://d1wqtxts1xzle7.cloudfront.net/48932495/Bosche-2010-ARCOM.pdf?1474207991=&response-content-disposition=inline%3B+filename%3DFusing_4D_Modelling_and_Laser_Scanning_f.pdf&Expires=1618850114&Signature=P6aNtcESBsOqZHphnga9nhE6QDACMh2Tjq2kcLG7iTNIUKxIk3
. (2010). Fusing 4D modeling and laser scanning for automated construction progress control. 26th ARCOM Annual Conference and Annual General Meeting, 1229-1238. Retrieved from https://researchportal.hw.ac.uk/en/publications/fusing-4d-modeling-and-laser-scanning-for-automated-construction-
. (2010). Front End Planning Tool (FEPT) based on an electronic process management. Journal of Construction Engineering and Project Management, 3(2), 1-12. Retrieved from https://doi.org/10.6106/JCEPM.2013.3.2.001
. (2013). Formalisms for query capture and data source identification to support data fusion for construction productivity monitoring. Automation in Construction, 20(4), 389-398. Retrieved from https://doi.org/10.1016/j.autcon.2010.11.009
. (2011). Fitting Range Data to Primitives for Rapid Local 3D Modeling Using Sparse Range Point Clouds. Automation in Construction 13, pp. 67-81.
. (2004). Financially sustainable management strategies for urban wastewater collection infrastructure–development of a system dynamics model. Tunnelling and Underground Space Technology, 39, 116-129. Retrieved from https://doi.org/10.1016/j.tust.2012.12.003
. (2014). Financially sustainable management strategies for urban wastewater collection infrastructure–Implementation of a system dynamics model. Tunnelling and Underground Space Technology, 39, 102-115. Retrieved from https://doi.org/10.1016/j.tust.2012.12.004
. (2014). Field trial of automated material tracking in construction. CSCE 2008 conference. Retrieved from https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=6221283060680869399
. (2008). Fatigue detection using phase-space warping. Journal of Biomechanical Engineering, 139(3). Retrieved from https://doi.org/10.1115/1.4035367
. (2017). Facilitating the Communication of Rework Information to Craft Workers Using an Augmented Reality Process. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 35. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=15915907439949132890&btnI=1&hl=en Facilitating-the-Communication-of-Rework-Information-to-Craft-Workers-Using-Augmented-Reality.pdf
. (2018). Exploratory study on the effectiveness of interface-management practices in dealing with project complexity in large-scale engineering and construction projects. Journal of Management in Engineering, 33(2). Retrieved from https://doi.org/10.1061/(ASCE)ME.1943-5479.0000488
. (2017). Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management. Construction Innovation.
. (2021). Experience, Productivity, and Musculoskeletal Injury among Masonry Workers. Journal of Construction Engineering and Management, Volume 143, issue 6. Retrieved from https://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943-7862.0001308
. (2017). Examining Business Impact of Owner Commitment to Sustainability. ASCE J. of Construction Engineering and Management Volume 132, Issue 4, pp. 384-392.
. (2006). Evaluation of the Economic Feasibility of Weigh-In-Motion in Canada. Transportation Association of Canada. Retrieved from https://www.researchgate.net/profile/Carl-Haas/publication/241513202_Evaluation_of_the_Economic_Feasibility_of_Weigh-In-Motion_in_Canada/links/571a2c8808ae6eb94d0c734f/Evaluation-of-the-Economic-Feasibility-of-Weigh-In-Motion-in-Canada.pdf
. (2008).