Publications

Search
[ Author(Asc)] Title Type Year
V
Vaziri, S. Hashemi, Haas, C. T. , Rothenburg, L. , Haas, R. C. , & Jiang, X. . (2013). Investigation of the effects of air temperature and speed on performance of piezoelectric weigh-in-motion systems. Canadian Journal of Civil Engineering, 40(10), 935-944. Retrieved from https://doi.org/10.1139/cjce-2012-0227
Vaziri, S. H. , Haas, C. T. , Rothenburg, L. , & Haas, R. C. . (2013). Investigation of the effect of weight factor on performance of piezoelectric weigh-in-motion sensors. Journal of Transportation Engineering, 139 (9), pp. 913-922.
Vaziri, S. Hashemi, Haas, C. , Rothenburg, L. , & Haas, R. . (2012). Investigation of Piezoelectric Weigh-in-Motion Sensors’ Performance in Asphalt Concrete Pavements in Cold Temperatures of Southern Ontario. Transportation Research Board 91st Annual MeetingTransportation Research Board, (12-1484). Retrieved from https://trid.trb.org/view/1129278
Vaziri, S. H. , Haas, C. , Rothenburg, L. , Ponniah, J. , & Haas, R. . (2011). Weigh-In-Motion Sensors’ Installation and Calibration Efforts on Highway 401 Perpetual Pavements, Woodstock. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=9374466208948809651&btnI=1&hl=en
T
Turkan, Y. , Bosche, F. , Haas, C. T. , & Haas, R. . (2014). Tracking of secondary and temporary objects in structural concrete work. Construction Innovation. Retrieved from https://doi.org/10.1108/CI-12-2012-0063
Turkan, Y. , Bosche, F. , Haas, C. T. , & Haas, R. . (2013). Tracking secondary and temporary concrete construction objects using 3D imaging technologies. In Computing in Civil Engineering (pp. 749-756). Retrieved from https://doi.org/10.1061/9780784413029.094
Turkan, Y. , Bosche, F. , Haas, C. T. , & Haas, R. . (2013). Toward automated earned value tracking using 3D imaging tools. Journal of construction engineering and management, 139(4), 423-433. Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000629
Turkan, Y. , Bosché, F. , Haas, C. , & Haas, R. . (2012). Automated earned-value tracking. Gerontechnology, 11(2). Retrieved from https://researchportal.hw.ac.uk/en/publications/automated-earned-value-tracking
Turkan, Y. , Bosche, F. , Haas, C. T. , & Haas, R. . (2012). Automated progress tracking using 4D schedule and 3D sensing technologies. Automation in construction, 22, 414-421. Retrieved from https://doi.org/10.1016/j.autcon.2011.10.003
Turkan, Y. , Bosche, F. , Haas, R. , & Haas, C. . (2012). Automated Progress Tracking Using 4D Schedule and 3D Sensing Technologies. Automation in Construction 22 , pp. 414-421.
Turkan, Y. , Bosche, F. , Haas, C. T. , & Haas, R. . (2011). Automated progress tracking of erection of concrete structures. Annual Conference of the Canadian Society for Civil Engineering, 2746-2756. Retrieved from https://d1wqtxts1xzle7.cloudfront.net/5279938/Automated_Progress_Tracking_of_Erection_of_Concrete_Structures_-_Turkan_et_al.pdf?response-content-disposition=inline%3B+filename%3DAutomated_Progress_Tracking_of_Erection.pdf&Expires=1618601575&Signature=apS
Turkan, Y. , Bosche, F. , Haas, C. T. , & Haas, R. . (2010). Towards automated progress tracking of erection of construction of concrete structures. Proceedings, Sixth International Conference on Innovation in Architecture, Engineering and Construction. Retrieved from http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.716.4785
Turkan, Y. , Bosche, F. , Haas, C. T. , & Haas, R. . (2010). Towards automated progress tracking of erection of concrete structures. Proceedings of the 6th International Conference on Innovation in Architecture, Engineering & Construction. Retrieved from https://pure.hw.ac.uk/ws/files/785816/AEC_2010_Turkan_Y._REVISED.pdf
TIGHE, S. L. , Haas, C. , Haas, R. , & Kennepohl, G. . (2008). Sustainability of Pavement Research Programs Through Knowledge Management, Realistic Policy Objectives, and Quantifiable Performance Measures. 2008 Annual Conference of the Transportation Association of CanadaTransportation Association of Canada. Retrieved from https://trid.trb.org/view/877071
Tighe, S. Louise, Mills, B. , Haas, C. T. , & Baiz, S. . (2007). Using Road Weather Information Systems (RWIS) to control load restrictions on gravel and surface-treated highways. Retrieved from https://trid.trb.org/view/890581
Teizer, J. , Caldas, C. H. , & Haas, C. T. . (2007). Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources. Journal of Construction Engineering and Management 133 (11), pp. 880-888.
S
Song, J. , Haas, C. T. , & Caldas, C. H. . (2007). A proximity-based method for locating RFID tagged objects. Advanced Engineering Informatics, 21(4), 367-376. Retrieved from https://doi.org/10.1016/j.aei.2006.09.002
Song, J. , Haas, C. , Caldas, C. , Ergen, E. , & Akinci, B. . (2006). Automating The Task of Tracking the Delivery and Receipt of Fabricated Pipe Spools in Industrial Projects. Automation in Construction, Vol. 15/2, pp 166-177.
Song, J. , Fagerlund, W. , Haas, C. , Vanegas, J. , & Tatum, C. . (2005). Considering Prework on Industrial Projects. ASCE Journal of Construction Engineering and Management, Vol. 131, no. 6, pp. 723-733.
Shokri, S. , Haas, C. T. , Haas, R. C. G. , & Lee, S. Hyun. (2016). Interface-management process for managing risks in complex capital projects. Journal of Construction Engineering and Management, 142(2). Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0000990

Pages