Publications
Dimensional variability analysis of construction assemblies using kinematics chains and building information model, 34. Retrieved from https://www.semanticscholar.org/paper/Dimensional-Variability-Analysis-of-Construction-Nahangi-Haas/a67265a486d24be97b4980f5f0d37fb8ad4a4d45?p2df
. (2017). Dislocation detection in field environments: A belief functions contribution. Expert Systems with Applications, 39(10), 8505-8513. Retrieved from https://doi.org/10.1016/j.eswa.2011.12.014
. (2012). Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory. Journal of Construction Engineering and Management, 146(2). Retrieved from https://doi.org/10.1061/(ASCE)CO.1943-7862.0001747
. (2020). Evaluating artificial intelligence tools for automated practice conformance checking. International Symposium on Automation and Robotics in Construction. Retrieved from https://doi.org/10.22260/isarc2018%2F0015
. (2018). Annual Conference of the Transportation Association of Canada, 1-17. Retrieved from https://www.researchgate.net/profile/Carl-Haas/publication/228452225_Evaluating_Weigh-In-Motion_Sensing_Technology_for_Traffic_Data_Collection/links/571a2c8808aee3ddc568ef7c/Evaluating-Weigh-In-Motion-Sensing-Technology-for-Traffic-Data-Collection.pdf
. (2007). Evaluation of automation levels for construction change management. Engineering, construction and architectural management. Retrieved from https://doi.org/10.1108/ECAM-01-2015-0013
. (2016). Evaluation of the Economic Feasibility of Weigh-In-Motion in Canada. Transportation Association of Canada. Retrieved from https://www.researchgate.net/profile/Carl-Haas/publication/241513202_Evaluation_of_the_Economic_Feasibility_of_Weigh-In-Motion_in_Canada/links/571a2c8808ae6eb94d0c734f/Evaluation-of-the-Economic-Feasibility-of-Weigh-In-Motion-in-Canada.pdf
. (2008). Examining Business Impact of Owner Commitment to Sustainability. ASCE J. of Construction Engineering and Management Volume 132, Issue 4, pp. 384-392.
. (2006). Experience, Productivity, and Musculoskeletal Injury among Masonry Workers. Journal of Construction Engineering and Management, Volume 143, issue 6. Retrieved from https://ascelibrary.org/doi/abs/10.1061/(ASCE)CO.1943-7862.0001308
. (2017). Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management. Construction Innovation.
. (2021). Exploratory study on the effectiveness of interface-management practices in dealing with project complexity in large-scale engineering and construction projects. Journal of Management in Engineering, 33(2). Retrieved from https://doi.org/10.1061/(ASCE)ME.1943-5479.0000488
. (2017). Facilitating the Communication of Rework Information to Craft Workers Using an Augmented Reality Process. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction, 35. Retrieved from https://scholar.google.ca/scholar?oi=bibs&cluster=15915907439949132890&btnI=1&hl=en Facilitating-the-Communication-of-Rework-Information-to-Craft-Workers-Using-Augmented-Reality.pdf
. (2018). Fatigue detection using phase-space warping. Journal of Biomechanical Engineering, 139(3). Retrieved from https://doi.org/10.1115/1.4035367
. (2017). Field trial of automated material tracking in construction. CSCE 2008 conference. Retrieved from https://scholar.google.ca/scholar?hl=en&as_sdt=0,5&cluster=6221283060680869399
. (2008). Financially sustainable management strategies for urban wastewater collection infrastructure–development of a system dynamics model. Tunnelling and Underground Space Technology, 39, 116-129. Retrieved from https://doi.org/10.1016/j.tust.2012.12.003
. (2014). Financially sustainable management strategies for urban wastewater collection infrastructure–Implementation of a system dynamics model. Tunnelling and Underground Space Technology, 39, 102-115. Retrieved from https://doi.org/10.1016/j.tust.2012.12.004
. (2014). Fitting Range Data to Primitives for Rapid Local 3D Modeling Using Sparse Range Point Clouds. Automation in Construction 13, pp. 67-81.
. (2004). Formalisms for query capture and data source identification to support data fusion for construction productivity monitoring. Automation in Construction, 20(4), 389-398. Retrieved from https://doi.org/10.1016/j.autcon.2010.11.009
. (2011). Front End Planning Tool (FEPT) based on an electronic process management. Journal of Construction Engineering and Project Management, 3(2), 1-12. Retrieved from https://doi.org/10.6106/JCEPM.2013.3.2.001
. (2013). Fusing 4D modeling and laser scanning for automated construction progress control. 26th ARCOM Annual Conference and Annual General Meeting, 1229-1238. Retrieved from https://researchportal.hw.ac.uk/en/publications/fusing-4d-modeling-and-laser-scanning-for-automated-construction-
. (2010).